Browse
Search
2019-601-E AMS - Warren Hay Whitted boiler pipe replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-601-E AMS - Warren Hay Whitted boiler pipe replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 3:21:57 PM
Creation date
9/5/2019 2:54:57 PM
Metadata
Fields
Template:
Contract
Date
8/28/2019
Contract Starting Date
8/28/2019
Contract Ending Date
10/31/2019
Contract Document Type
Agreement - Construction
Amount
$50,885.00
Document Relationships
R 2019-601 AMS - Warren Hay Whitted boiler pipe replacement
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Startup Checklist <br /> Version 1 3/20/2019 Page 1 <br /> It is the responsibility of each agency to ensure all contractual obligations are met and contract <br />monitoring is documented. This checklist serves as a tool to assist the agency during that process. <br />(Include in the contract monitoring folder/binder.) <br /> <br />Completed By: Angel Barnes <br /> <br />Department: AMS <br />Contract Begin/End Date: 9/1/19 to 10/31/19 Name of Vendor / Contractor: Warren-Hay <br /> <br /> <br />Signatures: <br />Capital Projects Manager ______________________________________Date_________________ <br />Asset Mgmt. Services Director______________________________________Date_________________ <br />Deputy County Manager ______________________________________Date_________________ <br />Note: Once all signatures are received on contract and checklist, notice to proceed shall be issued. <br />Contract Management Activities <br /> <br />YES NO N/A <br /> <br />General <br /> <br />Does the contract file contain a copy of the signed, executed current contract? <br /> <br />X <br />Does the contract file have a copy of all attachments listed in the contract? <br /> <br />X <br />Does the contract file have all bid addendums? <br /> <br /> X <br />Does the contract file contain contact information and a call log for Contractor’s key <br />personnel? <br /> X <br />Does the contract file contain a copy of Dispute Resolution Rules and Procedures? <br /> <br />X <br />Does the contract file clearly state the Contractor’s “Legal Notices” address? <br /> <br />X <br />Does the contract file include a copy of the insurance certificate? <br /> <br />X <br />Does the contract file contain any necessary licenses, certifications, etc.? <br /> <br />X <br />Does the contract file contain all warranty information? <br /> <br />X <br />Does the contract file contain all specifications, drawings or manuals incorporated into <br />the contract by reference? <br /> X <br />Does the contract file contain a list of all information furnished to the contractor during <br />bidding? <br />X <br />Does the contract file contain a list of government furnished property or services? <br /> <br />X <br />DocuSign Envelope ID: 6ADE3670-5672-4DD4-B793-654D507901E1 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.