Browse
Search
2019-601-E AMS - Warren Hay Whitted boiler pipe replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-601-E AMS - Warren Hay Whitted boiler pipe replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 3:21:57 PM
Creation date
9/5/2019 2:54:57 PM
Metadata
Fields
Template:
Contract
Date
8/28/2019
Contract Starting Date
8/28/2019
Contract Ending Date
10/31/2019
Contract Document Type
Agreement - Construction
Amount
$50,885.00
Document Relationships
R 2019-601 AMS - Warren Hay Whitted boiler pipe replacement
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Heating and Air Conditioning <br />P.O. Box 818 • Hillsborough, NC 27278 <br />919-732-4362 <br />919-732-8660 Fax <br />State License #7211 www.warren-hay.com <br />6-13-2012 / 8/14/2012 /August 6, 2019 <br />Orange County Public Works <br />Re: Boiler pipe replacement <br />PROPOSAL <br />We hereby submit specifications and estimates for: As noted: <br /> <br />x Excavate new ditch alongside of existing underground piping. Install new pre insulated <br />hot water piping. Install new in ground vault. Vault will contain new isolation valves that <br />will allow isolation of individual buildings when in need of service. <br />x Once piping is complete and tested there will be a clean and flush of all new piping <br />before piping is tied-in to existing hot water system. After clean and flush a shutdown <br />will be required to allow tie-ins to the boiler and adjacent buildings. The ditch will be <br />excavated, back field and compacted per county codes inspections. <br />x Provide all materials, and labor (During normal business hours). <br />x Proposal with pre insulated carbon steel piping. (1 year warranty on pipe and materials) <br /> <br />We propose hereby to furnish material and labor: $44,085.00 <br />Payment to be made at completion of scoped work. <br />Requested Alternate <br />x Provide & install pre-insulated Polypropylene pipe in lieu of steel above.Add $6,800.00 <br />Exclusions / Clarifications: <br />x Guarantee, warranty of existing equipment (boiler shut down, start-up by others). <br />x After hour, overtime, premium labor, expedited shipment <br />x Unsuitable soils, this work base on reinstalling removed dirt and restoring back to existing finish. If <br />soil is unsuitable to place back for coverage additional cost will be charged on time and material basis. <br /> <br />ACCEPTANCE OF PROPOSAL:The above prices, specifications and conditions are <br />satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment <br />will be made as outlined above. <br />Signature: __________________________________Date:________________________ <br />Respectfully submitted by: Ron LaPann Commercial Division valid for 30 days ron.lapann@warren-hay.com <br />DocuSign Envelope ID: 6ADE3670-5672-4DD4-B793-654D507901E1
The URL can be used to link to this page
Your browser does not support the video tag.