Orange County NC Website
<br />Project Element Expense Description Qty <br />Per Item <br />Cost <br />CFAT <br />Grant <br />Funds <br />Orange <br />Co. Cost <br />Share Total Cost <br />Electric Vehicle <br />Lease Upgrade <br />Difference in monthly lease costs required to <br />upgrade from gasoline to electric ($10,537 for <br />24 months in base lease costs to be covered <br />separately by Orange County Transportation <br />Services). 24 $571 $10,967 $2,742 $13,709 <br /> <br /> <br /> <br />EV Charging <br />Station <br />Replacement <br />EVSE Replacement Swap-out from 1 Port <br />Pedestal to 1 AppCtrl smart Port Pedestal 12 $5,746 $55,162 $13,790 $68,952 <br />Electrical Infrastructure Parts and Pathways to <br />EV Charging Station 12 $256 $2,458 $614 $3,072 <br />Engineered Drawings as needed, Consulting, <br />remote system monitoring and reporting, <br />Energy Management/ Environment Systems <br />program management 12 $896 $8,602 $2,150 $10,752 <br />Tax (7.5%) 1 $6,208 $4,967 $1,242 $6,208 <br />Shipping 1 $490 $392 $98 $490 <br /> <br /> <br /> <br />Standalone <br />Solar EV <br />Charging <br />Station <br />EV ARCTM Base Unit 1 $ 57,500 $46,000 $11,500 $57,500 <br />Transformer ARC Upgrade - required for <br />shipping outside of California. allows the pre- <br />assembled unit to be shipped on the back of a <br />flatbed trailer 1 $ 1,900 $1,520 $380 $1,900 <br />Envision Charge J-1772 EV charging plug 3 $ 1,789 $4,294 $1,073 $5,367 <br />40kWh Battery Storage Upgrade 1 $ 10,022 $8,018 $2,004 $10,022 <br />Bumper Stops (set of 3) 1 $ 365 $292 $73 $365 <br />Warranty (included in base price) 1 $ - $0 $0 $0 <br />Shipping and Handling (ExWorks San Diego, CA) <br />1 $ 5,722 $4,578 $1,144 $5,722 <br />Project Total $147,247 $36,812 $184,059 <br />% of project <br />total 80% 20% <br /> <br />SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal is applicable to <br />this item: <br />• GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY <br />The creation and preservation of infrastructure, policies, programs and funding necessary <br />for residents to provide shelter, food, clothing and medical care for themselves and their <br />dependents. <br /> <br />The expansion of the County’s electric vehicle fleet supports the growing electric vehicle <br />industry in Orange County and North Carolina which supports jobs and investments in research <br />and development, charging station manufacturing, and electrical contracting. Electric vehicles in <br />Orange County are also able to refuel for less than half of the cost of gasoline, safeguarding <br />taxpayer resources. <br /> <br />3