| <br />Project Element Expense Description Qty 
<br />Per Item 
<br />Cost 
<br />CFAT 
<br />Grant 
<br />Funds 
<br />Orange 
<br />Co. Cost 
<br />Share  Total Cost 
<br />Electric Vehicle 
<br />Lease Upgrade 
<br />Difference in monthly lease costs required to 
<br />upgrade from gasoline to electric ($10,537 for 
<br />24 months in base lease costs to be covered 
<br />separately by Orange County Transportation 
<br />Services). 24     $571  $10,967 $2,742 $13,709 
<br />  
<br /> 
<br />          
<br />EV Charging 
<br />Station 
<br />Replacement 
<br />EVSE Replacement Swap-out from 1 Port 
<br />Pedestal to 1 AppCtrl smart Port Pedestal  12  $5,746  $55,162 $13,790 $68,952 
<br />Electrical Infrastructure Parts and Pathways to 
<br />EV Charging Station 12     $256  $2,458 $614 $3,072 
<br />Engineered Drawings as needed, Consulting, 
<br />remote system monitoring and reporting, 
<br />Energy Management/ Environment Systems 
<br />program management 12     $896  $8,602 $2,150 $10,752 
<br />Tax (7.5%) 1  $6,208  $4,967 $1,242 $6,208 
<br />Shipping 1     $490  $392 $98 $490 
<br />  
<br /> 
<br />          
<br />Standalone 
<br />Solar EV 
<br />Charging 
<br />Station 
<br />EV ARCTM Base Unit 1  $   57,500  $46,000 $11,500 $57,500 
<br />Transformer ARC Upgrade - required for 
<br />shipping outside of California. allows the pre-
<br />assembled unit to be shipped on the back of a 
<br />flatbed trailer  1  $     1,900  $1,520 $380 $1,900 
<br />Envision Charge J-1772 EV charging plug 3  $     1,789  $4,294 $1,073 $5,367 
<br />40kWh Battery Storage Upgrade 1  $   10,022  $8,018 $2,004 $10,022 
<br />Bumper Stops (set of 3) 1  $        365  $292 $73 $365 
<br />Warranty (included in base price) 1  $            -    $0 $0 $0 
<br />Shipping and Handling (ExWorks San Diego, CA)  
<br />1  $     5,722  $4,578 $1,144 $5,722 
<br />Project Total       $147,247  $36,812  $184,059  
<br />% of project 
<br />total       80% 20%   
<br /> 
<br />SOCIAL JUSTICE IMPACT:  The following Orange County Social Justice Goal is applicable to 
<br />this item: 
<br />• GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY  
<br />The creation and preservation of infrastructure, policies, programs and funding necessary 
<br />for residents to provide shelter, food, clothing and medical care for themselves and their 
<br />dependents. 
<br /> 
<br />The expansion of the County’s electric vehicle fleet supports the growing electric vehicle 
<br />industry in Orange County and North Carolina which supports jobs and investments in research 
<br />and development, charging station manufacturing, and electrical contracting.  Electric vehicles in 
<br />Orange County are also able to refuel for less than half of the cost of gasoline, safeguarding 
<br />taxpayer resources.  
<br /> 
<br />3 |