Browse
Search
Agenda - 03-06-2001-8g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 03-06-2001
>
Agenda - 03-06-2001-8g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:24:47 AM
Creation date
8/29/2008 10:29:23 AM
Metadata
Fields
Template:
BOCC
Date
3/6/2001
Document Type
Agenda
Agenda Item
8g
Document Relationships
2001 NS Housing - Housing Rehabilitation Contract Award
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2001
2001 S Housing - North State Legal Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2001
Minutes - 03-06-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Delores Mason <br />336 McMasters St. Chapel Hill <br />942-$913 <br />August 14, 2000 <br />3. Remove approximately 96 square feet of sheetrock. Install matching sheetrock, tape and <br />finish smooth. Install a textured finish to match the existing. <br />4. Paint the ceiling with ceiling white, latex paint. Paint to cover completely. <br />5. Install vinyl replacement windows and trim. Install a 4$-inch, insulated picture window <br />to replace the existing picture window. <br />6. Paint all new window trim and the front door with semigloss latex paint. Paint to cover <br />completely. Clean the paneling, door and trim. Paint with two coats satin finish <br />polyurethane. <br />7. Clean the floor with varsol. Install four coats of latex polyurethane. <br />KITCHEN: <br />Remove the existing rear door and storm door. Install an eight-inch jamb, metal insulated <br />door unit with weather-stripping and threshold. Install lockset and deadbolt to be keyed <br />the same as the front door. Install a wide view peephole. Install matching casing. <br />2. Install aluminum over wood core storm door with pneumatic closure, and vinyl sweep. <br />Door to have self-storing glass, push button lock and lifetime warranty. <br />3. Remove the existing ceiling. Install 12 inchxl2 inch ceiling file and 2%a inch crown <br />mold. <br />4. Install vinyl replacement windows and trim. <br />5. Remove the existing cabinets. Install wall and base cabinets with oak fronts and factory <br />finish. Install rolled, formica counter tops <br />6. Remove approximately 96 square feet of floor and subfloor. Repair with likesize <br />plywood. <br />
The URL can be used to link to this page
Your browser does not support the video tag.