Browse
Search
2019-590-E AMS - High Performance Building Solutions Link assessment
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-590-E AMS - High Performance Building Solutions Link assessment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 3:17:30 PM
Creation date
9/3/2019 10:40:55 AM
Metadata
Fields
Template:
Contract
Date
8/29/2019
Contract Starting Date
8/29/2019
Contract Ending Date
8/30/2019
Contract Document Type
Contract
Amount
$1,200.00
Document Relationships
R 2019-590 AMS - High Performance Building Solutions Link assessment
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:2560017F-D6E8-4CA4-8F6F-11521994BEAA <br /> High Performance Building Solutions <br /> Building Envelope Consulting and Testing Projects <br /> Over the past three years HPBS Staff has conducted over 183 envelope consulting and testing <br /> projects for 10 school districts and for 18 Military Bases totaling over 12.5 million square feet of <br /> space and ranging in size from 5,000 to 900,000 square feet. <br /> Previous Experience Highlights <br /> Project Name and Location Brief Description Client's Information <br /> ECU Neurology Clinic HPBS conducted a building East Carolina Facilities <br /> Greenville,NC envelope Retro-Commissioning Maintenance Department— <br /> repair for a 23,000 square foot Health Science Campus <br /> medical clinic maintained by East <br /> -- Carolina University's facilities. Mike Rowe <br /> The building was experiencing Facilities Assistant Director <br /> °g's"`"' elevated humidity levels,moisture <br /> intrusion,mold and comfort (252)-744-2382 <br /> complaints. HPBS eventually <br /> served as the General Contractor <br /> for the $400,000 repair. Not only <br /> were moisture and comfort <br /> ECU Neurology Building Healina Energy problems resolved,but because the <br /> Pre and Post Air Sealing&Attir EncapSulatir•- <br /> �.° project repaired a failed air and <br /> i� thermal barrier for the entire attic, <br /> f r� <br /> o the building experience significant <br /> ................. <br /> . energy savings as well. <br /> r e <br /> Chart: Before&After Heating <br /> H[In <br /> Greenville, North Carolina Cost vs Heating Degree Days. <br /> Springboro Schools, HPBS conducted a Building Tremco Roofing and Building <br /> S rin boro, Ohio Envelope Assessment and air Maintenance <br /> leakage testing for a High School, <br /> Jr. High, Intermediate and 3 Vince Paladino, <br /> Elementary schools in Springboro, <br /> �. Director of Canam <br /> Ohio. The assessment uncovered vpaladino@tremcoinc.com <br /> major air leakage design and <br /> construction flaws and moisture (717)497-7111 <br /> management deficiencies. The <br /> assessment provided a scope of Todd Smith, PE <br /> — work for correcting the deficiencies Energy Solutions Manager <br /> along with a budgetary estimate for TDSmith@tremcoinc.com <br /> the improvements and estimated (513) 708-6696 <br /> energy savings. Currently HPBS is <br /> contracted to also conduct air <br /> leakage testing after weatherization <br /> to quantify improvements to the <br /> building envelope. <br /> Building Envelope Assessment Proposal <br /> Orange County Government Services Center building, Hillsborough NC Page 5 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.