Browse
Search
Agenda 09-03-19 Item 12-5 - Information Item - Memorandum-NCDOT Corridor Updates – NC-54 West, S. Churton Street and Orange Grove Road Extension
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2019
>
Agenda - 09-03-19 Regular Meeting
>
Agenda 09-03-19 Item 12-5 - Information Item - Memorandum-NCDOT Corridor Updates – NC-54 West, S. Churton Street and Orange Grove Road Extension
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 9:11:45 AM
Creation date
9/3/2019 9:13:20 AM
Metadata
Fields
Template:
BOCC
Date
9/3/2019
Meeting Type
Special Meeting
Document Type
Agenda
Document Relationships
Minutes 09-03-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> NCDOT has begun final design and engineering as well as environmental analysis <br /> through its consultant— Kimley-Horn — towards implementing these projects. <br /> • January 8, 2019, — NCDOT hosted a public meeting on both projects. <br /> 0 4 design alternatives were proposed for Orange Grove Road extension. <br /> o Proposed cross sections for both projects were also presented. <br /> • March 11, 2019, — Hillsborough Board of Commissioners recommended the No <br /> Build Alternative for Orange Grove Road extension. <br /> • July 30, 2019, — NCDOT local officials meeting, four alternatives were <br /> recommended for South Churton Street widening, extending the project to US- <br /> 70A intersection. <br /> 0 1 St — no bridge replacement, improve intersection. <br /> 0 2nd — bridge replacement and intersection improvements, no bike/ped. <br /> 0 3rd — bridge replacement and intersection improvements, with bike/ped. <br /> 0 4t" — bridge replacement and intersection improvements, with multi-use path. <br /> o All four recommend a multi-use path on the east and a sidewalk on the west. <br /> • The multi-use path and sidewalk are subject to NCDOT's current cost <br /> share policy. <br /> • August 2019, — Hillsborough Board of Commissioners decided the Town does <br /> want improvements at the US-70A intersection but does not want the railroad <br /> bridge replaced. <br /> o Due to traffic volume and adequate bridge condition, DOT does not require <br /> the bridge over railroad tracks to be replaced. <br /> o As a separate matter, the railroad bridge will be under review as multiple <br /> tracks are considered in the corridor. <br /> o Should the Town want the railroad bridge replaced, DOT will require the Town <br /> to pay for it. <br /> Transportation Planning staff will continue to keep the BOCC apprised of these <br /> corridors. Feel free to contact staff with any questions. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.