| 3
<br />       														CFAT	Orange
<br />       												Per Item      Grant	Co.Cost
<br />      	Project Element   Expense Description  				Qty    Cost   	Funds       Share       Total Cost
<br />    				Difference in monthly lease costs required to
<br />      	Electric Vehicle    upgrade from gasoline to electric($10,537 for
<br />      	Lease Upgrade     24 months in base lease costs to be covered
<br />    				separately by Orange County Transportation
<br />    				Services).  						24     $571  	$10,967      $2,742      $13,709
<br />    				EVSE Replacement Swap-out from 1 Port
<br />    				Pedestal to 1 AppCtrl smart Port Pedestal     	12    $5,746  	$55,162     $13,790      $68,952
<br />    				Electrical Infrastructure Parts and Pathways to
<br /> 		EV Charging     EV Charging Station      				12     $256   	$2,458	$614       $3,072
<br />   		Station	Engineered Drawings as needed,Consulting,
<br />		Replacement     remote system monitoring and reporting,
<br />    				Energy Management/Environment Systems
<br />    				program management   				12     $896   	$8,602      $2,150      $10,752
<br />    				Tax(7.5%)  						1    $6,208   	$4,967      $1,242       $6,208
<br />    				Shipping    						1     $490     	$392  	$98 	$490
<br />    				EV ARC TM Base Unit					1    $  57,500      $46,000     $11,500      $57,500
<br />    				Transformer ARC Upgrade-required for
<br />    				shipping outside of California. allows the pre-
<br />    				assembled unit to be shipped on the back of a
<br /> 		Standalone      flatbed trailer      					1    $   1,900	$1,520	$380       $1,900
<br />   		Solar EV	Envision Charge J-1772 EV charging plug		3    $   1,789	$4,294      $1,073       $5,367
<br />   		Charging       40kWh Battery Storage Upgrade 			1    $  10,022	$8,018      $2,004      $10,022
<br />   		Station
<br />    				Bumper Stops(set of 3)   				1    $     365  	$292  	$73 	$365
<br />    				Warranty(included in base price)			1    $	-      	$0   	$0    	$0
<br />    				Shipping and Handling(ExWorks San Diego,CA)
<br />   												1    $   5,722	$4,578      $1,144       $5,722
<br />      	Project Total  											$147,247    $36,812     $184,059
<br />      	%of project
<br />      	total  													80% 	20%
<br />      	SOCIAL JUSTICE IMPACT:  The following Orange County Social Justice Goal is applicable to
<br />      	this item:
<br />   		•    GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY
<br />			The creation and preservation of infrastructure, policies, programs and funding necessary
<br />			for residents to provide shelter, food, clothing and medical care for themselves and their
<br />			dependents.
<br />      	The  expansion  of the  County's  electric  vehicle  fleet  supports  the  growing  electric  vehicle
<br />      	industry in Orange County and North Carolina which supports jobs and investments in research
<br />      	and development, charging station manufacturing, and electrical contracting.  Electric vehicles in
<br />      	Orange County are also able to refuel for less than half of the cost of gasoline, safeguarding
<br />      	taxpayer resources.
<br /> |