Browse
Search
Agenda 09-03-19 Item 6-b - Acceptance of Guaranteed Maximum Price (GMP) for the Orange County Northern Campus
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2019
>
Agenda - 09-03-19 Regular Meeting
>
Agenda 09-03-19 Item 6-b - Acceptance of Guaranteed Maximum Price (GMP) for the Orange County Northern Campus
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 8:50:53 AM
Creation date
9/3/2019 9:13:11 AM
Metadata
Fields
Template:
BOCC
Date
9/3/2019
Meeting Type
Special Meeting
Document Type
Agenda
Document Relationships
2019-617-E County Mgr - Bourdeaux CMAR contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
Minutes 09-03-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> Orange County Northern Campus <br /> Alternates <br /> 8/28/2019 <br /> Alternates: Yes/No Total Cost Subcontractor Bid Package Sub Cost Comments <br /> EAC Alt.1 Provide Steel Trellis at Entry of EAC Building N $ 48,208 Misc. $ <br /> BP-03A-Concrete Select Concrete BP-03A $ 2,000 <br /> BP-04A-Masonry Brodie Mason BP-04A $ 15,400 <br /> BP-05A-Steel Steel Technologies BP-05A $ 28,513 <br /> BP-09G-Painting DWH Painting BP-09G $ 2,295 <br /> EAC Alt 2 Provide Building Sign for EAC Building N $ 6,205 Misc. <br /> BP-10C-Signage AOA Signs BP-10C $ 4,205 <br /> BP-07C-Roofing AAR Roofing BP-07C $ 2,000 <br /> EAC Alt 3 Provide sunshades as noted on alternate plans <br /> and specifications N $ 17,200 <br /> J&H Glass BP-08A $ 17,200 <br /> EAC Alt 4 Wood look metal soffit Panel N $ 32,750 <br /> BP-07C Roofing AAR Roofing BP-07C $ 32,750 <br /> EAC Alt 5 Preferred Brand Alternate-EAC&POB-Trane Y $ - Warren Hay BP-23A $ - No Cost Change <br /> EAC Alt 6 Preferred Brand Alternate-EAC&POB- Warren Hay BP-23A No Cost Change <br /> Siemens Y <br /> DET Alt 1 Preferred Brand Alternate-Tyco Raven Carolina Fire Control BP-21A No Cost Change <br /> Institutional Heads at DET Y $ - <br /> DET Alt 2 Provide 150kW DC Solar Photovoltaic System at Misc. <br /> DET Y $ 417,000 <br /> BP-26A-Electrical-$358,000 $ 358,000 <br /> BP-07C-Roof-$59,000 $ 59,000 BP-07C to provide VE to <br /> reduce cost <br /> DET Alt 3 Preferred Brand Alternate-Detention-Siemens Warren Hay BP-23A $ - No Cost Change <br /> Controls Y $ <br /> DET Alt 4 Preferred Brand Alternate-Detention-Cylinders MTS BP-11C No Cost Change <br /> by Corbin Russwin Y $ <br /> Total Selected Cost $417,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.