Browse
Search
Agenda 09-03-19 Item 6-b - Acceptance of Guaranteed Maximum Price (GMP) for the Orange County Northern Campus
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2019
>
Agenda - 09-03-19 Regular Meeting
>
Agenda 09-03-19 Item 6-b - Acceptance of Guaranteed Maximum Price (GMP) for the Orange County Northern Campus
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 8:50:53 AM
Creation date
9/3/2019 9:13:11 AM
Metadata
Fields
Template:
BOCC
Date
9/3/2019
Meeting Type
Special Meeting
Document Type
Agenda
Document Relationships
2019-617-E County Mgr - Bourdeaux CMAR contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
Minutes 09-03-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> B O R D E A U X <br /> Construction Company, Inc. <br /> August 28, 2019 <br /> Ms. Bonnie Hammersley <br /> County Manager <br /> Orange County <br /> PO Box 8181 <br /> Hillsborough, NC <br /> Reference: Orange County Northern Campus—GMP#1 (Early Site & Long Lead Items) <br /> Dear Ms. Hammersley, <br /> Thank you for the opportunity to provide the Guaranteed Maximum Price Proposal#1 (GMP#1) <br /> proposal based on the backup attached to this proposal. <br /> Guaranteed Maximum Price#1: $10,019,850 <br /> The GMP#1 scope includes the following bid scopes: BP-02A Surveying, BP-03A Building Concrete (bond <br /> and reinforcing engineering), BP-05A Structural Steel (bond and detailing), BP-11C DEC/SCSC, BP-13A <br /> Prefabricated Steel Cells (engineering), BP-13B Pre-engineered Metal Building, and BP-31A Earthwork <br /> (Mobilization, Erosion Control, Clearing, Grading, Offsite Water,Allowances Pertaining to Grading). <br /> In addition to cost of work items above, GMP#1 includes general (full 20 month duration), CM <br /> allowances, Building permit allowance, and Owners contingency(partial). CM Contingency, Fee, Early <br /> Completion Bonus, and Bonds and Insurances are calculated on each GMP individually. Unused CM <br /> allowances, Owner Contingency, Building permit allowance, and Subcontractor allowances will be <br /> returned in full to the owner at completion of the project. Unused CM contingency will be returned to <br /> Owner with 70% returned to Owner in accordance with Article 5.7 of the Contract. <br /> We are looking forward to beginning construction on the Orange County Northern Campus project. <br /> Should you have any questions, please contact me. <br /> Very truly yours, <br /> Bordeaux Construction Company, Inc. <br /> J. Blair Bordeaux, P.E. <br /> President <br /> Enclosure <br /> 135 E. Martin St., Suite 101, Raleigh, NC 27601 1 (919) 220-1141 <br /> www.bordeauxconstruction.com I License 9266-U <br />
The URL can be used to link to this page
Your browser does not support the video tag.