Browse
Search
Agenda 09-03-19 Item 6-b - Acceptance of Guaranteed Maximum Price (GMP) for the Orange County Northern Campus
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2019
>
Agenda - 09-03-19 Regular Meeting
>
Agenda 09-03-19 Item 6-b - Acceptance of Guaranteed Maximum Price (GMP) for the Orange County Northern Campus
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 8:50:53 AM
Creation date
9/3/2019 9:13:11 AM
Metadata
Fields
Template:
BOCC
Date
9/3/2019
Meeting Type
Special Meeting
Document Type
Agenda
Document Relationships
2019-617-E County Mgr - Bourdeaux CMAR contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
Minutes 09-03-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> Steve to confirm with engineer HH to confiml <br /> Change NEMA 4X requirement for 1200A SE'Service requirements apply to EAC and Parks Base and follow <br /> 62 GET BP-26A Disconnect to NEMA 3R y (5,150 00)SN to confirm MA&HH up with Englneer of Record for recommendation <br /> GET,EAC,& Allow the ability to substitute the required manufacturer or th <br /> 63 POB BP-26A Solar Panels with an'Equal To' (3,50000) BCC BCC to confirm qualifications with BDE <br /> Steve to confirm with engineer HH to confirm <br /> Substitute requirement to have Inverters Installed In NEMA 4 requirements apply to EAC and Parks Base and follow <br /> GET,EAC,& enclosures and allow for Installing Inverters that are already up with Engineer of Record for recommendation.BC <br /> 64 POB BP-26A NEMA 3R rated y (2,500 00)NZ&SN to confirm MA,HH&BCC to confirm If pricing Includes DIET <br /> 65 GET BP-26A Level 1 sound enclosure in lieu o level N (6,800 00)Geneto, <br /> 66 GET BP-26A Provide open transition ATS In lieu of bypass Isolation switch (7,850 00) MA Steve to confirm <br /> 67 GET BP-26A Prowtle 24 hour base tank in lieu 48 hot N (3,60000) a emtoi <br /> pec cat on - nate costs to prov i <br /> opportunity for Owner's representative to observe tests at <br /> 68 GET BP-26A factory y (4,60000) <br /> 69 GET BP-26A RF Booster system QFQI,electrical infrastructure to rema N (65,670 00)Need to address M Us rom BDE <br /> 70 EAC BP-31A Delete gravel walk pat N (64400) <br /> 71 EAC BP-31A Delete foundation drain at EAC buildin, N (13,01200) <br /> 72 SITE BP-32A Delete DelegatedDesign requirement N (2,00000) <br /> 73 SITE BP-32A Change Vinyl to alvan,ed Fenceat P I y (3,60000) <br /> Gate Option Rev umpsfer gates to a y rye en <br /> 74 SITE BP-32A Powder coat y (14,900 00)Delegated design to remain <br /> 75 SITE BP-32A Gate Orton 2 Revise dumpster gates to chainlink vnth sla N (31,000 00) <br /> ange umpseren mum nn,nuisomyr,wny c amm <br /> 76 SITE BP-32A w/pnvacyslats-+$9100fence,$(18,000)masonry N (8,90000) <br /> (466,493.00) <br /> 0.00 Maybe(?f <br /> ota v uchon: (1,054,368.00) <br /> ccep ee (466,493.00) <br />
The URL can be used to link to this page
Your browser does not support the video tag.