<br /> It..# Bldg Bid Package cop ion Deduction Accepted(Yes/No) Value Comments Action Inm require
<br /> TT757T_.u_gMy=0Sf Need to
<br /> 1 Del M'. Reduce polished concrete scope(polished to sealed) y (5,250 OD)determine rooms,confirm and cost MA Confine rooms and square footage
<br /> 2 EAC&POB BP-03A Delete MVRA ad,i,tu,,@ EAC Y (14,60000)
<br /> Revise pricing to provide dgki insulation below slab
<br /> perimeter of office wing(gndhnes A-B @ EM
<br /> elevators&gntlhnes 14 @ North elevation) Retain
<br /> manufacturers standard Hashing and trim termination
<br /> base of metal well panels for full perimeter of builtling
<br /> Select confrmed wash to move insulation from exteno
<br /> 3 FOS BP-03A Delete msulabon&cop @ FOS y (1,200 00)Concrete-2665,PEMB-1200,reviers,c BCC-updated to under slab
<br /> requirements to housing,booking,an cot Moseley to coot nam testing scope during concret
<br /> 4 DET BP-0 3A only
<br /> ce N 12,300 00)FF/FL requirement remains In spec,tes MA pre-install
<br /> Use smooth face integral color CMU,n lieu of ground face
<br /> rec yard-and tlumpster enclosures @ detention(EAC is tin c
<br /> 5 DET BP-04A &CMU) y (10,00000)
<br /> At bock only.Precast tote white
<br /> mortar,white cement Rec yards&
<br /> Delete colored mortar and go with standard grey mortar exce it tlumpster surrounds to be colored mortu
<br /> 6 DET&EAC BP-04A at precast head Joints Y (18,000 00)@ Integral color CMU with dryblock
<br /> Delete Galvanivng ol all interior terrace level taming H BP-05A410,539 BP-09G Revise cost to reflect painting ceding only,m-nnn
<br /> 7 DET BP-05A&09G columns,closure plate) y (4,269 OD)$6,270 BCC-updated structure to remain HDG
<br /> 8 DET&EAC BP-05A angea c top me punted instead of gavnm N (4,90000)
<br /> Detail is pre erred to not catch dust
<br /> 9 DET BP-04A&05A Delete shower well plate&run CMU to cooing N 5,940 00 easier to keep clean
<br /> Revise brick anger detail to bent pate hot, Iowa at
<br /> 10 DET BP-05A (7/A5.21) N (1,84700)
<br /> hange countertops in AA35,AA63,AA 8,AA89&AA90 Revise cost to keep AA90 Solid surface-Revise to
<br /> 11 DET BP-06A from SS to'lam y (1,62500) BCC-updated $1200 for AA90
<br /> 12 DET BP-06A Booking Desk diamond plate from HDG to Polished Aluminum y (646 00)
<br /> Adding Aluminum Plateinsitle west end cavity of Bookm
<br /> 13 DET BP-WA Desk y 98800
<br /> 14 DET BP-06A Deletethe qualifications Y (65000)Still require AWl from manufactur on on manu cturer can cator
<br /> 15 EAC BP-06A EAC Delete W P-1 y (2,770 00)Wall to be painted accent wic
<br /> cost'Retain quartz countertops r
<br /> Demonstratlon Kitchen 1305 and Reatrooms 101 and
<br /> 16 EAC BP-06A EAC'Change all Quartz countertops to SS N (7,082 00) BCC 103 Revise all other locations to P-LAM
<br /> 17 EAC BP-06A EAC Change all countertopsm o uam,and SS to P-lai y (26,IN 00)quartz in kitchen,SS in public bathmom B uptlated updated
<br /> 18 POB BP-06A angea counters m to - Y (3,68200)
<br /> 19 EAC BP-06A Change to melamine intents in lieu of plywood @ EA B Melamine almady in protect.No credit to gr
<br /> Confim if scope includes ,Wise Prong,shoulk
<br /> 20 DET BP-07C Revise coping to shop fabricated In lieu of prefabricated y (10,000 00) BCC-updated be closer to$12-151,
<br /> 21 DET BP-07C Revise roo EJ to membrane and backer and systei y (10,000 00) BCC-updated
<br /> Adjusts t e t not ova a e
<br /> 22 DET BP-07C Roof aftemale credit-PV System Y (20.000 00)DET all 2 Isnt accepted BCC Updated
<br /> Add flm.Wp
<br /> POB,delete tags per spec(P B was nc
<br /> s 23 DET BP-07E included in bid cope) y 1,00000
<br /> 24 EAC&POB BP-08A Change vertical
<br /> roullion@ EAC&POB
<br /> to Y (520 00)
<br /> Delete inlemredmlemullion change sill mullion at deteMw
<br /> 25 DET BP-08A to 2.5" y (2,80000) BCC-updated
<br /> 26 DIET&EAC BP-09B eete epoxy grou N (1,55000)
<br /> Det:Change tie to standard ine assured and standard we
<br /> 27 DET BP-09C mold y (2,860 00)Base bid was NRC fine fissured
<br /> 28 DET BP-09C et Delete tectum acoustical panes in daymom N (17.05000)Fabric panels remain
<br /> Specified ceiling the will remain in EA(
<br /> EAC Change ble to Standard Fine Fissured and standard w I Multipurpose Room 102 and EAC Boato
<br /> 29 EAC BP-09C mold y it 1,50000)Room 104
<br /> POB Change tile to Standard Fine-Issured and scan a
<br /> 30 POE BP-09C mold Y (1,08000)
<br /> 31 EAC BP-09D Revise LVT to V T at EA N (7,590 00)
<br /> 32 EAC BP-10BDelete operable partftion @ EAC N (40.000 00)ROM drywall,steel,OP,and covedn
<br /> Revise Signage Allowance by 30%.Detenton goes fro,
<br /> DET,EAC,& $30,000 to$20,000 and EAC/POB goes from$15,00010
<br /> 33 FOS BP-10C $10,000 y (20,962 00)Lowered OH&P and Soft cost
<br /> Food Service as per pate y w I
<br /> maintain shop drawings,coordination,rough-In Inspection,
<br /> Install labor,and probabyl the washer/dryer Coordinate
<br /> kitchen hood,kitchen hood Install,and walk-In cooler freezer Will be addressed post GMP for County
<br /> 34 DET BP-11B also N (250,000 00)to be relmbureed(ROM)
<br /> BP-11 B:Washer dryer in Issue room F I(no specs o Owner to provide W/Din issue room
<br /> 35 DET BP-11B called out on FS plans)-Camed as CM allowance#11 y (5,000 00)Rough-in to remain
<br /> Change Sallyport/Comldor sliding detention doors with secuo
<br /> hardware sets SH6/6A to detenbon swing doors with security
<br /> 36 DET BP-11C hardware set SH2-Savings$9,500 N (9,50000)
<br /> Post meeting,B w iced that glass was quote.
<br /> Change secunty glass type SG13F W SG14F where per spec.Drawings are less sinngenl Moseley to
<br /> 37 DET BP-11C scheduled-Savings$24,000 N (24,00000)Review W 3/4"or 1"GCP MA cofirm scope
<br /> Delete top row of light
<br /> openings at elan on o ow met
<br /> 38 DET BP-1 IC
<br /> window frame OHMS N (12,00000)
<br /> ""de install 4 racks and UPSs ustead of 7 as shown or
<br /> 39 DET BP-11C DWG's for EQ Room-Savings$1 0,500 y (10,50000) MA-Updated Steve onfinned acceptable
<br /> Series rig configuration r oor status netea
<br /> 40 DET BP-11C dual indication-Savings$10,000 N (10,00000)
<br /> No audio threshold monitoring or IC station beep
<br /> 41 DET BP-11 C confrmaton of call button activation-Savings$8,500 N (8,500 00) Travis Travis W review with Sheriff
<br /> omputer or oggng nslea o a erver- avng
<br /> 42 DET BP-11C $5,000 a Y (5,00000) MA-Updated Steve confirmed acceptable
<br /> 43 DET BP-11C Lower CAcards fro,400 W 200-Sa,ngs$1,001 y (1,00000)
<br /> Remove Phase 2 Touch re en ontro am su mite
<br /> 44 DET BP-11C meeting-Savings$10,OOO N (10.00000)
<br /> 45 EAC BP-11C Credit transactional window @2 EA( y (3,10000)Doubled ups in
<br /> 46 POB BP-13B Change PEMB color line from Signature 300 to Signature2 N (1,80000)
<br /> Deduct W remove the small PIA system and convert to cot
<br /> 47 DET BP-21A sprinkler N (8,50000)
<br /> ummn
<br /> cress grease interceptor n lieu o spec stee
<br /> 48 DET BP-22A Keep FOG monitoring system Y (9,955 00)
<br /> Delete the Polyethylene sheet wrapping of UG Cast Iron r
<br /> 49 DET BP-22A kitchen waste piping y (38000)
<br /> 50 DET BP-22A Use standard weight cast Iron In lieu of XH cast Iron for kfch Y (2,200 00)
<br /> Delete PHT-1 Geothermal water heater Note.this will require
<br /> installation of 2 adtlNonal GWH and upassng the gas main in
<br /> the buddug and the branch piping into the mechanical on
<br /> This is oHeretl as a butlget only antl subject to verdicobon
<br /> upon a review of the engineers nedesgn There.11 be
<br /> aditonal savings in the mechanical scope for the eliminabo
<br /> 51 EAC BP-22A of W WHP-1 and electrical to both PHT-1 and%VVHP-1 N (19,400 00)
<br /> 52 DET BP-23A m ra am oto cot enna r am six Y (20.000 00)Would add to MBE
<br /> 53 EAC BP-23A EAC RTU1 Delete condenser cod wmosmn wabn y (3,90000)
<br /> 54 EAC BP-23A AC Delete SS dmTnpar N (1,82000)
<br /> 55 DET BP-23A Removing final filter but maintain Mery 8 stands, y (4,900 00) B B ri to confirm final scope with Warren He
<br /> 56 DET BP-23A Delete roof screens(carried as CM allowance#( y (118,000 00) MA Leaves budget o
<br /> Revise EAC/POB spec 230510 to a11ow eartrar HVA ussgt
<br /> 57 EAC&POB BP-23A (CM allowance#10 comes temp HVAC during construction) y (25,000 00)Remove last 2 dems of 230510
<br /> u at lute a um num for feeders 11 OA and larger In building
<br /> 58 EAC&POB BP-26A EAC&POB. Y (10,000 00)
<br /> ubs,WW EMT con 1ud r R when wndud is larger that
<br /> 59 DET BP-26A 2" y it 8,000 00)Confirm where scope occurs
<br /> 60 DET BP-26A u st lute ecure pe meter area y (30,246 00)Confirm color coded stay:
<br /> Removewncreteenwsetl requremenci or ductbank met
<br /> 61 SITE BP-26A whereHmns untler roadways N (13,00000)