Orange County NC Website
8 <br /> Orange County Northern Campus Construction Manager: Bordeaux Construction Company <br /> GMP proposal <br /> 8/28/2019 <br /> Bid Package Low Bidder GMP#1 GMP#2 Totals Contract MBE$ <br /> 01A General Trades CB&H Contracting $ 240,040 $ 240,040 $ 240,040.00 <br /> 01 B Final Cleaning CB&H Contracting $ 18,750 $ 18,750 $ 18,750.00 <br /> 02A Surveying Triangle Surveyors $ 36,425 $ 36,425 <br /> 03A Building Concrete Select Concrete $ 22,500 $ 1,172,450 $ 1,194,950 $ 1,194,950.00 <br /> 04A Turnkey Masonry Brodie Contractors $ 2,675,000 $ 2,675,000 $ 2,675,000.00 <br /> 05A IStructural Steel Steel Technology, Inc. $ 54,970 $ 1,433,335 $ 1,488,305 $ - <br /> 06A Casework Blankenship Associates $ 180,640 $ 180,640 $ 180,640.00 <br /> 07B Sprayfoam MIDI $ 125,055 $ 125,055 $ 125,055.00 <br /> 07C Roofing AAR of NC $ 1,094,000 $ 1,094,000 $ 164,100.00 <br /> 07D Caulk&Sealants JT Murphy Construction $ 77,000 $ 77,000 <br /> 07E Firestopping C.L Downey $ 58,508 $ 58,508 $ - <br /> 08A Aluminum&Glass J&H Glass $ 218,300 $ 218,300 $ 55,107.00 <br /> 08B Overhead Coiling Doors Custom Door&Gate $ 119,500 $ 119,500 $ 119,500.00 <br /> 09A Drywall Sears Contract $ 736,700 $ 736,700 $ 736,700.00 <br /> 09B Hard Tile Concordia $ 72,510 $ 72,510 $ - <br /> 09C Acoustical Ceilings Acousti $ 131,000 $ 131,000 $ - <br /> 09D V C T&Carpet Brock Contract $ 106,300 $ 106,300 <br /> 09E Epoxy Coatings Blair Duron $ 98,447 $ 98,447 <br /> 09F Polished Concrete Floorin David Allen Co $ 99,877 $ 99,877 <br /> 09G Painting DWH Painting $ 379,573 $ 379,573 <br /> 10A Specialties Martin Arch. $ 124,080 $ 124,080 <br /> 10B Operable Partitions Proven Products $ 24,440 $ 24,440 $ - <br /> 10C Signage AOA Signs $ 88,145 $ 88,145 $ 88,145.00 <br /> 10D Lockers Virginia School Equipment $ 14,600 $ 14,600 <br /> 11 B Food Service Equipment Deacon Food Service $ 322,900 $ 322,900 <br /> 11C DEC/SEC Montgomery Technology $ 3,498,900 $ 3,498,900 $ - <br /> 12A Window Treatment Precision Walls $ 12,910 $ 12,910 <br /> 13A Prefabricated Steel Cells SteelCell of NA $ 96,130 $ 1,506,015 $ 1,602,145 $ 29,740.00 <br /> 13B Pre-Engineered Metal Buil Central Builders of Mebane $ 312,700 $ 312,700 $ 205,756.00 <br /> 21A Fire Protection Carolina Fire Control $ 710,940 $ 710,940 <br /> 22A Plumbing Comfort Systems USA $ 1,882,490 $ 1,882,490 $ 84,712.00 <br /> 23A HVAC Warren-Hay $ 3,886,394 $ 3,886,394 $ 182,660.00 <br /> 26A Turnkey Electrical Bryant-Durham $ 4,109,000 $ 4,109,000 $ - <br /> 31A Earthwork Carolina Sunrock $ 3,432,661 $ 1,884,680 $ 5,317,341 $ 530,000.00 <br /> 32A Chain Link Fencing Frye Fencing $ 84,700 $ 84,700 <br /> 32B Landscaping Norris Landscaping $ 176,875 1 $ 176,875 1 $ - <br /> VE items accepted $ (466,493) $ (466,493) <br /> Alternates accepted $ 417,000 $ 417,000 <br /> Totals $ 7,454,286 $ 23,815,661 $ 31,269,947 21.2% <br /> General Conditions $ 1,184,693 $ - $ 1,184,693 <br /> CM Allowances&Tap Fees $ 533,000 $ $ 533,000 <br /> Building Permit $ 81,000 $ $ 81,000 <br /> Owner's Contingency $ 50,000 $ 550,000 $ 600,000 <br /> CM Contingency; 2%COW $ 149,086 $ 476,313 $ 625,399 <br /> Sub Total $ 9,452,065 $ 24,841,974 $ 34,294,039 <br /> Early Completion Bonus, 1% $ 94,521 $ 248,420 $ 342,940 <br /> FEE 3.75% $ 354,452 $ 931,574 $ 1,286,026 <br /> Sub Total $ 9,901,038 $ 26,021,968 $ 35,923,006 <br /> Bond& Insurances 1.2% $ 118,812 $ 312,264 $ 431,076 <br /> GMP TOTAL $10,019,850 $26,334,232 $ 36,354,082 <br />