Browse
Search
Agenda 09-03-19 Item 6-b - Acceptance of Guaranteed Maximum Price (GMP) for the Orange County Northern Campus
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2019
>
Agenda - 09-03-19 Regular Meeting
>
Agenda 09-03-19 Item 6-b - Acceptance of Guaranteed Maximum Price (GMP) for the Orange County Northern Campus
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 8:50:53 AM
Creation date
9/3/2019 8:25:04 AM
Metadata
Fields
Template:
BOCC
Date
9/3/2019
Meeting Type
Special Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> Construction Manager Contingency $625,399 <br /> Unknown Construction Costs <br /> Early Completion Bonus <br /> 1% of Cost of Work <br /> $1,628,966 <br /> Construction Manager Fee <br /> 3.75% of Cost of Work <br /> Bonds and Insurance <br /> 1.2% of Cost of Work $431,076 <br /> TOTAL GUARANTEED MAXIMUM PRICE $36,354,082 <br /> At the end of the construction project, any unspent owner contingency funds or allowances are <br /> retained by the County. If any amount of the Construction Manager contingency is unspent, <br /> seventy percent (70%) is retained by the County, and thirty percent (30%) is shared with the <br /> construction manager as an incentive to avoid unnecessary construction costs. <br /> The GMP is one of the required elements to seek approval from the Local Government <br /> Commission (LGC) to borrow money for the project. LGC approval is scheduled for October 1, <br /> and approximately $10 million of the total project costs are recommended for financing in the <br /> Fall financing package based on cash flow needs. <br /> Bordeaux Construction has requested a notice to proceed on the initial site work and long lead <br /> time materials immediately following acceptance of the GMP in order to avoid winter site <br /> conditions and remain on schedule for project delivery. As a result, the proposed GMP is <br /> recommended in two parts. The first part (GMP #1) is $10,019,850 million would be allowed to <br /> proceed prior to formal approval by the LGC on October 1. This strategy has precedent and <br /> poses minimal risk to the County. The notice to proceed for the balance of the project (GMP #2) <br /> totaling $26,334,232 would occur following formal approval by the LGC as the construction <br /> schedule dictates. <br /> FINANCIAL IMPACT: The Board of Commissioners authorized a total project budget of $40.2 <br /> million. Given a GMP of $36.4 million, projected professional fees of approximately $3.3 million, <br /> and a furniture, fixtures, and equipment budget of $625,000, the project is expected to be on <br /> budget assuming that contingency funds and other allowances are not entirely exhausted during <br /> construction. <br /> SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable <br /> to this item: <br /> • GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND <br /> INEQUITY <br /> The fair treatment and meaningful involvement of all people regardless of race or color; <br /> religious or philosophical beliefs; sex, gender or sexual orientation; national origin or <br /> ethnic background; age; military service; disability; and familial, residential or economic <br /> status. <br />
The URL can be used to link to this page
Your browser does not support the video tag.