Orange County NC Website
12 <br /> Orange County Northern Campus <br /> Construction Manager Allowances <br /> ITEM DESCRIPTION OF WORK ALLOWANCE QUANTITY UNIT SCHEDULED <br /> VALUE <br /> 1 Temp Electrical $ 55,000 LS $ 55,000.00 <br /> 2 Temp Heat $ 6,000 LS $ 6,000.00 <br /> 3 Temp Access Road $ 15,000 LS $ 15,000.00 <br /> 4 Temp Water $ 6,000 LS $ 6,000.00 <br /> 5 Final Electrical $ 58,000 LS $ 58,000.00 <br /> 6 Rent dum ster $ 32,000 LS $ 32,000.00 <br /> 7 Site Sign $ 18,000 LS $ 18,000.00 <br /> 8 Water tap fees $ 170,000 LS $ 170,000.00 <br /> 9 Roof Screen Add $ 143,000 LS $ 143,000.00 <br /> 10 Temp HVAC usage $ 25,000 LS $ 25,000.00 <br /> 11 Issue Room W/D $ 5,000 LS $ 5,000.00 <br /> $ 533,000.00 <br />