Orange County NC Website
10 <br /> Orange County Northern Campus <br /> Bid package deductions <br /> 812 612 01 9 <br /> It..# Bldg Bid Package cop ion Deduction Accepted(Yes/No) Value Comments Action Inm require <br /> TT757T_.u_gMy=0Sf Need to <br /> 1 Del M'. Reduce polished concrete scope(polished to sealed) y (5,250 OD)determine rooms,confirm and cost MA Confine rooms and square footage <br /> 2 EAC&POB BP-03A Delete MVRA ad,i,tu,,@ EAC Y (14,60000) <br /> Revise pricing to provide dgki insulation below slab <br /> perimeter of office wing(gndhnes A-B @ EM <br /> elevators&gntlhnes 14 @ North elevation) Retain <br /> manufacturers standard Hashing and trim termination <br /> base of metal well panels for full perimeter of builtling <br /> Select confrmed wash to move insulation from exteno <br /> 3 FOS BP-03A Delete msulabon&cop @ FOS y (1,200 00)Concrete-2665,PEMB-1200,reviers,c BCC-updated to under slab <br /> requirements to housing,booking,an cot Moseley to coot nam testing scope during concret <br /> 4 DET BP-0 3A only <br /> ce N 12,300 00)FF/FL requirement remains In spec,tes MA pre-install <br /> Use smooth face integral color CMU,n lieu of ground face <br /> rec yard-and tlumpster enclosures @ detention(EAC is tin c <br /> 5 DET BP-04A &CMU) y (10,00000) <br /> At bock only.Precast tote white <br /> mortar,white cement Rec yards& <br /> Delete colored mortar and go with standard grey mortar exce it tlumpster surrounds to be colored mortu <br /> 6 DET&EAC BP-04A at precast head Joints Y (18,000 00)@ Integral color CMU with dryblock <br /> Delete Galvanivng ol all interior terrace level taming H BP-05A410,539 BP-09G Revise cost to reflect painting ceding only,m-nnn <br /> 7 DET BP-05A&09G columns,closure plate) y (4,269 OD)$6,270 BCC-updated structure to remain HDG <br /> 8 DET&EAC BP-05A angea c top me punted instead of gavnm N (4,90000) <br /> Detail is pre erred to not catch dust <br /> 9 DET BP-04A&05A Delete shower well plate&run CMU to cooing N 5,940 00 easier to keep clean <br /> Revise brick anger detail to bent pate hot, Iowa at <br /> 10 DET BP-05A (7/A5.21) N (1,84700) <br /> hange countertops in AA35,AA63,AA 8,AA89&AA90 Revise cost to keep AA90 Solid surface-Revise to <br /> 11 DET BP-06A from SS to'lam y (1,62500) BCC-updated $1200 for AA90 <br /> 12 DET BP-06A Booking Desk diamond plate from HDG to Polished Aluminum y (646 00) <br /> Adding Aluminum Plateinsitle west end cavity of Bookm <br /> 13 DET BP-WA Desk y 98800 <br /> 14 DET BP-06A Deletethe qualifications Y (65000)Still require AWl from manufactur on on manu cturer can cator <br /> 15 EAC BP-06A EAC Delete W P-1 y (2,770 00)Wall to be painted accent wic <br /> cost'Retain quartz countertops r <br /> Demonstratlon Kitchen 1305 and Reatrooms 101 and <br /> 16 EAC BP-06A EAC'Change all Quartz countertops to SS N (7,082 00) BCC 103 Revise all other locations to P-LAM <br /> 17 EAC BP-06A EAC Change all countertopsm o uam,and SS to P-lai y (26,IN 00)quartz in kitchen,SS in public bathmom B uptlated updated <br /> 18 POB BP-06A angea counters m to - Y (3,68200) <br /> 19 EAC BP-06A Change to melamine intents in lieu of plywood @ EA B Melamine almady in protect.No credit to gr <br /> Confim if scope includes ,Wise Prong,shoulk <br /> 20 DET BP-07C Revise coping to shop fabricated In lieu of prefabricated y (10,000 00) BCC-updated be closer to$12-151, <br /> 21 DET BP-07C Revise roo EJ to membrane and backer and systei y (10,000 00) BCC-updated <br /> Adjusts t e t not ova a e <br /> 22 DET BP-07C Roof aftemale credit-PV System Y (20.000 00)DET all 2 Isnt accepted BCC Updated <br /> Add flm.Wp <br /> POB,delete tags per spec(P B was nc <br /> s 23 DET BP-07E included in bid cope) y 1,00000 <br /> 24 EAC&POB BP-08A Change vertical <br /> roullion@ EAC&POB <br /> to Y (520 00) <br /> Delete inlemredmlemullion change sill mullion at deteMw <br /> 25 DET BP-08A to 2.5" y (2,80000) BCC-updated <br /> 26 DIET&EAC BP-09B eete epoxy grou N (1,55000) <br /> Det:Change tie to standard ine assured and standard we <br /> 27 DET BP-09C mold y (2,860 00)Base bid was NRC fine fissured <br /> 28 DET BP-09C et Delete tectum acoustical panes in daymom N (17.05000)Fabric panels remain <br /> Specified ceiling the will remain in EA( <br /> EAC Change ble to Standard Fine Fissured and standard w I Multipurpose Room 102 and EAC Boato <br /> 29 EAC BP-09C mold y it 1,50000)Room 104 <br /> POB Change tile to Standard Fine-Issured and scan a <br /> 30 POE BP-09C mold Y (1,08000) <br /> 31 EAC BP-09D Revise LVT to V T at EA N (7,590 00) <br /> 32 EAC BP-10BDelete operable partftion @ EAC N (40.000 00)ROM drywall,steel,OP,and covedn <br /> Revise Signage Allowance by 30%.Detenton goes fro, <br /> DET,EAC,& $30,000 to$20,000 and EAC/POB goes from$15,00010 <br /> 33 FOS BP-10C $10,000 y (20,962 00)Lowered OH&P and Soft cost <br /> Food Service as per pate y w I <br /> maintain shop drawings,coordination,rough-In Inspection, <br /> Install labor,and probabyl the washer/dryer Coordinate <br /> kitchen hood,kitchen hood Install,and walk-In cooler freezer Will be addressed post GMP for County <br /> 34 DET BP-11B also N (250,000 00)to be relmbureed(ROM) <br /> BP-11 B:Washer dryer in Issue room F I(no specs o Owner to provide W/Din issue room <br /> 35 DET BP-11B called out on FS plans)-Camed as CM allowance#11 y (5,000 00)Rough-in to remain <br /> Change Sallyport/Comldor sliding detention doors with secuo <br /> hardware sets SH6/6A to detenbon swing doors with security <br /> 36 DET BP-11C hardware set SH2-Savings$9,500 N (9,50000) <br /> Post meeting,B w iced that glass was quote. <br /> Change secunty glass type SG13F W SG14F where per spec.Drawings are less sinngenl Moseley to <br /> 37 DET BP-11C scheduled-Savings$24,000 N (24,00000)Review W 3/4"or 1"GCP MA cofirm scope <br /> Delete top row of light <br /> openings at elan on o ow met <br /> 38 DET BP-1 IC <br /> window frame OHMS N (12,00000) <br /> ""de install 4 racks and UPSs ustead of 7 as shown or <br /> 39 DET BP-11C DWG's for EQ Room-Savings$1 0,500 y (10,50000) MA-Updated Steve onfinned acceptable <br /> Series rig configuration r oor status netea <br /> 40 DET BP-11C dual indication-Savings$10,000 N (10,00000) <br /> No audio threshold monitoring or IC station beep <br /> 41 DET BP-11 C confrmaton of call button activation-Savings$8,500 N (8,500 00) Travis Travis W review with Sheriff <br /> omputer or oggng nslea o a erver- avng <br /> 42 DET BP-11C $5,000 a Y (5,00000) MA-Updated Steve confirmed acceptable <br /> 43 DET BP-11C Lower CAcards fro,400 W 200-Sa,ngs$1,001 y (1,00000) <br /> Remove Phase 2 Touch re en ontro am su mite <br /> 44 DET BP-11C meeting-Savings$10,OOO N (10.00000) <br /> 45 EAC BP-11C Credit transactional window @2 EA( y (3,10000)Doubled ups in <br /> 46 POB BP-13B Change PEMB color line from Signature 300 to Signature2 N (1,80000) <br /> Deduct W remove the small PIA system and convert to cot <br /> 47 DET BP-21A sprinkler N (8,50000) <br /> ­ummn <br /> cress grease interceptor n lieu o spec stee <br /> 48 DET BP-22A Keep FOG monitoring system Y (9,955 00) <br /> Delete the Polyethylene sheet wrapping of UG Cast Iron r <br /> 49 DET BP-22A kitchen waste piping y (38000) <br /> 50 DET BP-22A Use standard weight cast Iron In lieu of XH cast Iron for kfch Y (2,200 00) <br /> Delete PHT-1 Geothermal water heater Note.this will require <br /> installation of 2 adtlNonal GWH and upassng the gas main in <br /> the buddug and the branch piping into the mechanical on <br /> This is oHeretl as a butlget only antl subject to verdicobon <br /> upon a review of the engineers nedesgn There.11 be <br /> aditonal savings in the mechanical scope for the eliminabo <br /> 51 EAC BP-22A of W WHP-1 and electrical to both PHT-1 and%VVHP-1 N (19,400 00) <br /> 52 DET BP-23A m ra am oto cot enna r am six Y (20.000 00)Would add to MBE <br /> 53 EAC BP-23A EAC RTU1 Delete condenser cod wmosmn wabn y (3,90000) <br /> 54 EAC BP-23A AC Delete SS dmTnpar N (1,82000) <br /> 55 DET BP-23A Removing final filter but maintain Mery 8 stands, y (4,900 00) B B ri to confirm final scope with Warren He <br /> 56 DET BP-23A Delete roof screens(carried as CM allowance#( y (118,000 00) MA Leaves budget o <br /> Revise EAC/POB spec 230510 to a11ow eartrar HVA ussgt <br /> 57 EAC&POB BP-23A (CM allowance#10 comes temp HVAC during construction) y (25,000 00)Remove last 2 dems of 230510 <br /> u at lute a um num for feeders 11 OA and larger In building <br /> 58 EAC&POB BP-26A EAC&POB. Y (10,000 00) <br /> ubs,WW EMT con 1ud r R when wndud is larger that <br /> 59 DET BP-26A 2" y it 8,000 00)Confirm where scope occurs <br /> 60 DET BP-26A u st lute ecure pe meter area y (30,246 00)Confirm color coded stay: <br /> Removewncreteenwsetl requremenci or ductbank met <br /> 61 SITE BP-26A whereHmns untler roadways N (13,00000) <br />