1 <br /> ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: September 3, 2019 <br /> Action Agenda <br /> Item No. 6-b <br /> SUBJECT: Acceptance of Guaranteed Maximum Price (GMP) for the Orange County <br /> Northern Campus <br /> DEPARTMENT: County Manager's Office <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> 1. Guaranteed Maximum Price Letters Travis Myren, Deputy County Manager, <br /> from Bordeaux Construction with (919) 245-2308 <br /> Attachments <br /> PURPOSE: To accept a Guaranteed Maximum Price (GMP) of $36,354,082 as presented by <br /> Bordeaux Construction (Attachment 1) for the development of the Orange County Northern <br /> Campus. <br /> BACKGROUND: In July 2018, the County retained Bordeaux Construction to serve as its <br /> Construction Manager at Risk (CMAR) for the development of the Northern County Campus. <br /> The Construction Manager at Risk project delivery method was chosen to improve cost <br /> containment and cost certainty compared to other project delivery methods. Cost containment <br /> is improved by allowing the Construction Manager to work collaboratively with the project <br /> designers to yield the most cost effective design solutions from a construction standpoint. Cost <br /> certainty is secured through a contractually binding guaranteed maximum price that is provided <br /> to the County prior to start of construction. The CMAR process is also more transparent as the <br /> CMAR provides more detailed financial accounting information with the entire project team <br /> compared to a general contractor on a design-bid-build project. <br /> In February 2019, the Board of Commissioners reviewed schematic design cost estimates for <br /> the Northern County Campus and authorized a total budget of $40.2 million. The Campus, <br /> located off of Highway 70 in Hillsborough, is intended to include a replacement Detention <br /> Center, Environment and Agriculture Center, and Parks Operations Base. Substantial <br /> completion is scheduled for March 9, 2021, and final completion is scheduled for May 9, 2021. <br /> Campus Elements <br /> • Detention Center <br /> The new Detention Center would consist of one hundred forty-four (144) beds in <br /> approximately 48,900 square feet. The new facility would replace the existing 40,227 <br /> square foot detention facility located in downtown Hillsborough that was originally <br /> constructed in 1925 with additions and modifications occurring in the early 1980's and <br /> mid-1990's. <br />