Browse
Search
2019-575-E AMS - Hepaco courthouse stormwater cleanout
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-575-E AMS - Hepaco courthouse stormwater cleanout
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 2:30:27 PM
Creation date
8/27/2019 1:52:43 PM
Metadata
Fields
Template:
Contract
Date
8/19/2019
Contract Starting Date
8/30/2019
Contract Ending Date
11/30/2019
Contract Document Type
Agreement - Services
Amount
$6,250.00
Document Relationships
R 2019-575 AMS - Hepaco courthouse stormwater cleanout
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:58936744-93CF-49DD-8E3B-8686F5361 F84 <br /> HEPAC <br /> Serious experience for serious tlllms. <br /> QUOTATION <br /> CUSTOMER: Orange County,NC DATE: August 2,2019 <br /> ADDRESS: 200 South Cameron St TERMS: Per Contract <br /> Il llsborough,NC 27278 QUOTE NO.: 44-028 <br /> ATTN.: Paul Sorrell REFERENCE:Orange County,NC <br /> Email: psoi-rell@oianpecouplyne.gov oiangecountyne.gov Courthouse Expansion <br /> SCM Cleaning/Repair <br /> WE ARE PLEASED TO QUOTE ON THE FOLLOWING: <br /> SCOPE OF WORK: REPACO proposes to provide Ibor, equipment, materials and special services to <br /> perform the cleanout of the three (3) underground stormwater SCM devices and repair of the dissipater pad <br /> located at 200 South Cameron Street in Hillsborough,NC. Work activities will consist of the use of one (1) <br /> 3,000-gallon capacity Iiquid vacuum truck,pressure washer and other necessary tools to remove the debris and <br /> sediments ftom the underground detention box and the North and South Hydrodynamic Separators(including <br /> their respective PVC inspection pipes). In addition, IIEPACO will utilize a mini excavator to remove <br /> approximately 12-inches of sediment from the base of the discharge pipe and install a stone dissipater pad <br /> using Class B riprap and separation fabric. The sediment remove fiorn below the discharge pipe will he spread <br /> evenly on the perimeter of the discharge pipe flow path, where it will be seeded and covered with straw to <br /> prevent erosion.This scope of work assumes the dissipater pad will measure approximately four(4) feet wide <br /> by six(6)feet long and 12 inches deep; work will need to be performed outside of normal operating hours of <br /> the courthouse in order to minimize civilian traffic. Pictures of progress will be provided to client upon <br /> completion of work activities. <br /> r <br /> DESCRIPTION UNIT ESTIMATED UNIT PRICE TOTAL <br /> NUMBER ESTIMATED <br /> OF UNITS PRICE:,-v,: <br /> Labor,equipment,materials and special <br /> services to provide above stated scope of I Lump Sum 1 $6,250.00 $6,250.00 <br /> work. <br /> Total Estimated Cost $6,250.00 F <br /> Pricing is subject to all lei-tits and conditions as outlined on page 2 <br /> QiJOTATION GOOD FOR THIRTY DAYS.ALL PRICES,TERMS,AND CONDITIONS ARE SUBJECT TO <br /> RE,VIEW BY US PRIOR TO ORDER ACCEPTANCE, <br /> ENVIRONMENTAL CONTRACTORS <br /> CORPORATE OFFICE.+P.O.BOX 26308 9 C I[A R L9[-1'E,NC 28221 •(800)888-7689•(704)598-9782•FAX(704)5 98-7 82 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.