Browse
Search
2019-574-E AMS - Burke Design mural muster room HVAC study
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-574-E AMS - Burke Design mural muster room HVAC study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 2:28:38 PM
Creation date
8/27/2019 1:52:38 PM
Metadata
Fields
Template:
Contract
Date
8/26/2019
Contract Starting Date
8/26/2019
Contract Document Type
Agreement - Consulting
Amount
$7,100.00
Document Relationships
R 2019-574 AMS - Burke Design mural muster room HVAC study
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:3E30BB72-BCBO-4AD5-BE8A-E2D61697B7FE <br /> Burke Design Group <br /> Consulting Engineers <br /> August 14, 2019 <br /> Re: Mural Courtroom & Muster Room HVAC Study/Design Proposal <br /> Angel, <br /> I have listed our pricing below. I will bring hard copies of our formal proposal to our meeting today at <br /> the new courtroom. <br /> Thanks, <br /> Ben <br /> Muster Room HVAC=$2,850.00 <br /> Run loads for the Muster room zone, including the break room, ammo storage, locker rooms and toilets. <br /> Field verify existing unit installation and controls. <br /> Provide design for correcting any deficiencies in the HVAC system for that zone. <br /> Provide positive humidity control in the design if possible <br /> Show any new electrical power needed for any revised system layouts <br /> Mural Courtroom=$4,250.00 <br /> Run loads for the Mural Courtroom, both in unoccupied and occupied modes. <br /> Field verify existing unit installation and controls. <br /> Review multiple scenario's for unit placement to allow code required access <br /> Provide permit drawings for final design chosen. <br /> Provide positive humidity control in the design if possible <br /> Show any new electrical power needed for any revised system layouts <br /> Burke Design Group <br /> Consulting Engineers <br /> www.bdgengineers.com <br /> 3305-109 Durham Drive <br /> Raleigh,NC 27603 <br /> (919)771-1916 office <br /> (919)618-0717 cell <br />
The URL can be used to link to this page
Your browser does not support the video tag.