Orange County NC Website
DocuSign Envelope ID: B0592255-65C9-4088-856C-ED399C645C1D <br /> [Departmental Use Only] <br /> TITLE LakeOrangeFY19-201Vlow <br /> FY 19-20 <br /> ORANGE COUNTY <br /> CONTRACT UNDER$5,000.00 <br /> NORTH CAROLINA <br /> THIS AGREEMENT, made and entered into this 23rd day of August, 2019, ("Effective Date") by <br /> and between Orange County, North Carolina, a body politic and corporate organized under the laws of the <br /> State of North Carolina, (the "County"), party of the first part; and Douglas P. Malinowski (the "Provider"), <br /> party of the second part; <br /> WITNESSETH: <br /> For the purpose and subject to the terms and conditions hereinafter set forth, the County hereby <br /> contracts for the services of the Provider, and the Provider agrees to provide the following services to the <br /> County in accordance with the terms of this Agreement,time being of the essence: <br /> The services and/or materials and/or construction (hereinafter referred to collectively as "Services") <br /> to be furnished under this Agreement are as follows: <br /> Task No. 1: Summer 2019 Mowing - Mow and trim brush on dam and surrounding area <br /> (approximately 4.3 acres in total) at Lake Orange to within 6 inches of the ground in a manner that does not <br /> cause rutting. This includes cutting and removing trees and limbs that have grown into or fallen across the <br /> entry way and access road to the dam and cutting any saplings or scrubby vegetation that may be growing at <br /> the water line of the dam. This also includes hand trimming around the instrumentation panels,the footbridge <br /> to the dam intake tower structure, and within the newly cleared areas along both sides of the concrete <br /> spillway channel and at the outlet pipe structure. See Attachment A for detailed quote. See Attachment B <br /> for map showing limits of work. This work must be completed no later than August 31, 2019. Task delivery <br /> completion date is subject to modification upon 15 days advanced written notice to Provider by County. <br /> Task No. 2: Fall/Winter 2019 Mowing - Mow and trim brush on dam and surrounding area <br /> (approximately 4.3 acres in total) at Lake Orange to within 6 inches of the ground in a manner that does not <br /> cause rutting. This includes cutting and removing trees and limbs that have grown into or fallen across the <br /> entry way and access road to the dam and cutting any saplings or scrubby vegetation that may be growing at <br /> the water line of the dam. This also includes hand trimming around the instrumentation panels,the footbridge <br /> to the dam intake tower structure, and within the newly cleared areas along both sides of the concrete <br /> spillway channel and at the outlet pipe structure. See Attachment A for detailed quote. See Attachment B <br /> for map showing limits of work. This work must be completed no later than November 30, 2019. Task <br /> delivery completion date is subject to modification upon 15 days advanced written notice to Provider by <br /> County. <br /> Task No. 3: Spring 2020 Mowing - Mow and trim brush on dam and surrounding area <br /> (approximately 4.3 acres in total) at Lake Orange to within 6 inches of the ground in a manner that does not <br /> cause rutting. This includes cutting and removing trees and limbs that have grown into or fallen across the <br /> entry way and access road to the dam and cutting any saplings or scrubby vegetation that may be growing at <br /> the water line of the dam. This also includes hand trimming around the instrumentation panels,the footbridge <br /> to the dam intake tower structure, and within the newly cleared areas along both sides of the concrete <br /> spillway channel and at the outlet pipe structure. See Attachment A for detailed quote. See Attachment B <br /> for map showing limits of work. This work must be completed no later than May 1, 2020. Task delivery <br /> completion date is subject to modification upon 15 days advanced written notice to Provider by County. <br /> The term of this agreement rendered shall be from August 23, 2019 to June 30,2020. <br /> Provider represents and agrees that Provider is qualified to perform and fully capable of performing and <br /> providing the services required or necessary under this Agreement in a fully competent, professional and <br /> Revised 12/18 1 <br />