Orange County NC Website
DocuSign Envelope ID: F52521 E7-10C1-43F9-B62F-C1 E599A5D572 <br /> a <br /> Maintenance 1. nspect of I ed rosi on ontrol Products at I east wee I y and after each <br /> significant(1/2 inch or greater)rain fall event repair immediately. <br /> ood contact with the ground must be mai ntai ned, and erosi on must not <br /> occur beneath the P. <br /> 3. ny areas of the Pthat are damaged or not in close contact with the <br /> ground shal I be repai red and stapl ed. <br /> . f erosi on occurs due to poorl y control I ed drai nage,the probl em shal I be <br /> fixed and the eroded area protected. <br /> oni for and repair the P as necessary until ground cover is <br /> establ i shed. <br /> References Prague, . oel. T / nvironmental, nc. " reen ngineering, esign <br /> pri nci pl es and appl i cati ons usi ng rol I ed erosi on control products" <br /> torm ater anagement anual for estern ashi ngton, ashi ngton tale <br /> epartment of col ogy, ater ual i ty Program <br /> http://www.ecy.wa.gov/programs/wq/stormwater/index.html <br /> rosion ontrol Technology ouncil, http://www.ectc.org <br /> 6.17.1 Rev.6/07 <br />