Browse
Search
2019-572-E Planning - Wellsmont Landscaping Lake Orange fence stump removal
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-572-E Planning - Wellsmont Landscaping Lake Orange fence stump removal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 2:25:03 PM
Creation date
8/27/2019 1:52:09 PM
Metadata
Fields
Template:
Contract
Date
8/23/2019
Contract Starting Date
8/23/2019
Contract Ending Date
9/30/2019
Contract Document Type
Contract
Amount
$3,125.00
Document Relationships
R 2019-572 Planning - Wellsmont Landscaping Lake Orange fence stump removal
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: F52521 E7-10C1-43F9-B62F-C1 E599A5D572 <br /> a <br /> Figure 6.17d Temporary Channel Liners; Washington State Department of Ecology <br /> Excavate channel to design <br /> Overlap 6" min. grade and cross-section <br /> r. <br /> Design depth <br /> Longitudinal <br /> anchor trench <br /> Overcut channel 2"to allow bulkin r IAL i JA <br /> during seedbed preparation <br /> 6 J <br /> Typical installation <br /> with erosion control <br /> blankets or turf <br /> reinforcement mats <br /> 6„ 6;, <br /> Intermittent check slot Longitudinal anchor trench <br /> Shingle-lap spliced ends or begin new <br /> roll in an intermittent check slot <br /> Prepare soil and apply seed before <br /> installing blankets, mats or other <br /> temporary channel liner system 3 <br /> f <br /> NOTES: <br /> 1. Design velocities exceeding 2 ft/sec require temporary blankets,mats or similar liners to protect <br /> seed and soil until vegetation becomes established. <br /> 2. Grass-lined channels with design velocities exceeding 6 ft/sec should include turf reinforcement <br /> mats <br /> 6.17.10 Rev.6/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.