Orange County NC Website
DocuSign Envelope ID:75037285-B337-4501-9103-53BE44A69DA2 <br /> without penalty to Owner immediately upon written notice to Contractor of the <br /> unavailability and non-appropriation of public funds. It is expressly agreed that Owner <br /> shall not activate this non-appropriation provision for its convenience or to circumvent the <br /> requirements of this Agreement, but only as an emergency fiscal measure during a <br /> substantial fiscal crisis. <br /> c. In the event of a change in the Owner's statutory authority, mandate and/or mandated <br /> functions, by state and/or federal legislative or regulatory action, which adversely affects <br /> Owner's authority to continue its obligations under this Agreement, then this Agreement <br /> shall automatically terminate without penalty to Owner upon written notice to Contractor <br /> of such limitation or change in Owner's legal authority. <br /> 10. NOTICES <br /> Any notice required by this Agreement shall be in writing and delivered by certified or registered <br /> mail, return receipt requested to the following: <br /> Owner: Contractor: <br /> Orange County Brad Lewis; President <br /> Attn: Marabeth Carr Triangle Landscaping Inc <br /> P.O. Box 8181 2010 Unity Way <br /> Hillsborough,NC 27278 Stem,NC 27581 <br /> 11. MISCELLANEOUS <br /> a. Duties and Obligations imposed by the Contract Documents shall be in addition to any <br /> Duties and Obligations imposed by state, federal or local law, rules, regulations and <br /> ordinances. <br /> b. No act or failure to act by the Owner or Contractor shall constitute a waiver of any right or <br /> duty granted them under the Contract Documents, nor shall any act or failure to act <br /> constitute any approval except as specifically agreed in writing. <br /> c. The Work shall be tested and inspected as required by the Contract Documents and as <br /> required by law. Unless prohibited by law the costs of all such tests and inspections <br /> related to state and federal codes such as ADA, Administrative, Electrical, Plumbing, <br /> Mechanical and Building Codes shall be borne by the Contractor. The costs for material <br /> and structural testing shall be conducted by an independent third party at the expense of the <br /> Owner. Delays related to any of the aforementioned tests and inspections shall not be <br /> grounds for delaying the completion of the work. If any such tests and inspections reveal <br /> deficiencies in the Work such that the Work does not comply with terms or requirements <br /> of the Contract Documents and/or the requirements of any code or law the Contractor is <br /> solely responsible for the cost of bringing such deficiencies into compliance with the terms <br /> of the Contract Documents and/or any code or law. <br /> d. Should the Architect, if an architect is retained for the project involving the Work, or <br /> Owner reject any portion of the Work for failing to comply with the Contract Documents <br /> Contractor shall immediately, at Contractor's expense, correct the Work. Any such <br /> rejection may be made before or after substantial completion. If applicable, any additional <br /> expense borne by the Architect under this section shall be paid at Contractor's expense. <br /> Revised 12118 6 <br />