Orange County NC Website
DocuSign Envelope ID: B883DFBA-83C4-4CO2-92D1-CAD668CBE4D7 <br /> CermSft "JO W Kirt Sto Independent Franchise Owner: Job#: KS967000174 <br /> Date: 07/24/2019019 <br /> 6104 Oak Forest Dr. <br /> Raleigh, NC 27616 <br /> EXTERIOR PROPOSAL (919)876-2008 <br /> Fax: (919)876-2013 <br /> kstorch@certapro.com <br /> 1-800-462-3782 <br /> License#: 59109 <br /> Full Workers Compensation Coverage/$2,000,000 General Liability Insurance <br /> Orange County Sportsplex Special Notes: <br /> Andrew Stock <br /> 101 Meadowlands Dr CertaPro Painters will repaint outlined surfaces using premium products from the Sherwin <br /> Hillsborough*,NC 27278 Williams Paint Company <br /> Phone:919-605-2418 <br /> AJStock@oc-sportsplex.com Production will take place when the pool is closed and other contractor work is being done <br /> A scissor lift will be required to repaint outlined surfaces, price is included in proposal. <br /> All"white"areas being repainted will receive 1 coat-Color match of existing surfaces. <br /> All accent blue areas will be repainted with 2-coat coverage,color TBD <br /> We will coordinate with other contractors timing of production during pool renovations <br /> All Banners and signs will be removed by customer prior to production <br /> ***Update 7/31/19*** <br /> We will caulk all expansion joints on tilt up walls and repaint entry walls from lobby to pool <br /> area <br /> Production to be done between dates of 8/17/19-9/1/19 when pool is closed for <br /> renovations <br /> ******CertaPro Painters is an officially Licensed General Contractor in the State of North <br /> Carolina,South Carolina and Tennessee****** <br /> *Surface Preparation/Cleaning-all previously painted surfaces will be cleaned effectively <br /> prior to applying coats of primer or finish paint systems,so that all specified coatings will <br /> bond effectively to substrate <br /> *Paint Application-all coatings will be applied in accord with manufacturer's written <br /> recommendations by brush,roll,spray(or combination). <br /> *Coat Thickness-paint material will be applied within manufacturer's recommended <br /> spread rate and mileage. <br /> *Safety Guidelines/MSDS -OSHA safety guidelines will be adhered to at all times and <br /> Material Safety Data Sheets for all products will be maintained on site. <br /> *Liability/Worker's Compensation-current copies of our liability and worker's <br /> compensation will be supplied prior to our start <br /> GENERAL DESCRIPTION: Painting to: Pool walls and entry ways at Orange County Sportsplex in Hillsborough,NC <br /> QUESTIONABLE AREAS <br /> Include Exclude <br /> CMU&Concrete walls,Wooden storage area walls,CMU Bathroom walls,Metal ceiling surfaces,All other surfaces in <br /> Columns all inside pool deck, Entry way walls pool deck area <br /> PREPARATION <br /> PRIMING Surface Type/Area Primer Purpose <br />