Browse
Search
2019-558-E OPT - Triangle Landscaping Simme Seat installationpdf
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-558-E OPT - Triangle Landscaping Simme Seat installationpdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 11:28:18 AM
Creation date
8/27/2019 1:50:33 PM
Metadata
Fields
Template:
Contract
Date
8/15/2019
Contract Starting Date
8/15/2019
Contract Ending Date
10/31/2019
Contract Document Type
Contract
Amount
$3,600.00
Document Relationships
R 2019-558 OCPT - Triangle Landscaping Simme Seat installationpdf
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:4913679613-1634-4210-BE70-3ADUE413MD3 <br /> EA 16-1A ATTACHMENT Q <br /> INSTALLATION ADJACENT TO EXISTING CONCRETE <br /> 3' <br /> Dowel 3 <br /> z <br /> PLAN SECTION <br /> 1. Excavate 13" min. below surface adjacent to existing concrete. <br /> Place and compact 3/4"— crushed rock I" min. thickness. <br /> 2. Drill two 518" did. holes into existing concrete at locations shown <br /> and epoxy two #4, 12" long rebor dowels into holes. <br /> J. Form for and pour 12" min. thick concrete pad. <br /> 4. After concrete cures, strip forms and backfill around concrete pad. <br /> INSTALLA TION A T ISOLA TED REMOTE LOCA TION <br /> 2IX <br /> \ No <br /> PLAN SECTION <br /> 1. Excavate minimum of 13" below surface to form for concrete <br /> footing of dimensions shown. Place and compact 3/4"— crushed <br /> rock of I" min. thickness. <br /> 2. Form for and pour concrete footing. <br /> J. After concrete cures, strip forms and backfill around concrete pad. <br /> FIGURE 1 — FOUNDATION INSTALLATION INSTRUCTIONS <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.