Browse
Search
Agenda - 02-26-2001-c5
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 02-26-2001
>
Agenda - 02-26-2001-c5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 9:07:33 AM
Creation date
8/29/2008 10:29:07 AM
Metadata
Fields
Template:
BOCC
Date
2/26/2001
Document Type
Agenda
Agenda Item
c5
Document Relationships
Minutes - 02-26-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19/16/2609 13:01 919?326403 <br />ORANGE CO SHERIFF <br />PAGE 61 <br />~* n. <br />~~ <br />Office <br />P.O. Sox 8181 -Margaret Lane <br />HILLS80R~UGH <br />Hillsborough, NC 27278 <br />- 919 -732.$1 S1/64¢3050 <br />of the Orange County Sheriff <br />Lindy Pe>gdergrass, Sheri~~ <br />`,~.,~ w o <br />.* <br />yt sa <br />~r <br />it St <br />Octot~ 5, 2000 <br />To; RAbert Davis <br />Orange County ptanz~ix~g <br />Revere Road <br />Hi1L~oroug}~ NC 27278 <br />k'zom: ShexiufE'Lindy Pender~ass <br />Re: 'The Preserve (lohn R McAdams Compan~r) <br />proposed Dev~elo~nenE <br />Hwy. 57 <br />Hiusboxough Township <br />Dear Mr_ Davis, <br />On October 2, I received a request• for a letter fromi Aawn Heric, ]'vhn R 1VlcAdams <br />Company, the developer of the Preserve, Highway 57, Orange County. <br />Dawn l"Ieric left a copy ofthe preliminary plans for the project at the Sheriffs 0 -Vice. Z <br />have looked at the plans and feel due to the size of this proposed developme>t Z will have <br />to respond with rnlare than a `des we can" letter. <br />Laolsing at the plans, this project will have over 640 homes, a large number of vff ces and <br />businesses, which will generate a tat of calls for our patrol area # 13. From. the beginning <br />we will be patrolling the project and protecting property (motor graders etc; after working <br />hours). As soon as builditag construction begins we will be asked to protect materials and <br />equipment an a regular basis. With the other duties already assigned tv this area, these <br />additional responsibilities will require us to i~acrease our patrol sta~at the very least by a <br />minimum of4 deputies and equiprrtent, including vehicles. This will be an additional cost <br />far Prange Cau~aty and everyone needs to known this from the outset. When this <br />development is completed for us to service the people properly in the Preserve, there <br />should be a an increase of 4 more deputies and equipment. Asub-station should be built <br />in this development for the people and deputies to meet and work out of <br />
The URL can be used to link to this page
Your browser does not support the video tag.