Orange County NC Website
State of North Catrolina <br />~~~ <br />Department of Environment and Natural Resources Reviewing emu: <br />INTERGOVERNMENTAL REVIEW -- PROJEC'x' COMMENTS Project NumberLJ ~ Due Date: <br />ARcr review of this project it has been determined that the ENR permit(s) and/or approvals indicated may need to be obtained in order for this project to <br />comply with North Carolina Law. Questions regarding these permits should be addressed to the Regional Ofliice indicated on the reverse of the form. <br />All applications, information and guidelines relative to these plans and permits are available from the same Regional Office. <br />Nottnal Process Time <br />(statutory time limit) <br /> <br />O <br /> <br /> <br />O <br /> <br /> <br />d <br /> <br /> <br />O <br /> <br />d pE~~g <br />Permit to construct & operate wastewater treatmrnt <br />facilities, sewn system extentsions & sewtr systems <br />aot discharging into state surface waters. <br />NPD1=S =permit to discharge into surface water and/or <br />permit to operate and conswct wastewater facilities <br />discharging into state surface waters, <br />' <br />Water Use Permit <br /> <br />Well Construction Permit <br /> <br />Dredge and Fill Permit SPECIAL APPLICATION PROCEDURES or REQIJIREI~tENTS <br />Application 90 days before begin eottsttuction or award of construction <br />contracts. On-site irtspeotion. Post-application technical ronferenee usual. <br /> <br />Application 180 days before begin activity. On-site inspection. Pre-application <br />conference usual. Additionally, obtain permit to contstruct wastewater <br />treatmrnt facility-granted after NPDBS. Reply time, 30 days after receipt of <br />plans or issue ofNPDFS pemtit-whichever is later. <br />Praapplieation technical conference usually necessary <br /> <br />Complete application must be received and permit ;^ 'ed prior to the <br />irisnallatian of a well. <br />Application copy must be served on each adjacrnt riparian property owner <br />On-sits inspection. Pre-application contferrnee usual. Filling may require <br />Easrntrnt to Fill from N.C. Department of Administration and Federal Dredge <br />and Fill Permit <br />30 days <br /> <br />(90 days) <br />90-120 days <br /> <br />(. UA) <br /> <br />30 days <br />(N/A) <br />7 days <br />(15 days) <br />55 days <br /> <br />(90 days) <br /> Permit to construct Rc operate .4ir Pollution Abatement N/A <br />60 days <br /> facilities and/or Emission Sources as per 13 A NCAC <br /> (2Q.D100, 2Q.0300, 2H.0600j <br /> Any open burning associated with subject proposal <br /> must be in compliance with 1 S A NCAC 2D.1900 <br />p Demolition or renovations of swctures containing 60 days <br /> asbestos material must be in compliance with I S A <br /> NCAC 2D.1 110 (a) (1) which requires notification and <br /> removal prior to demoli[ion. Contact Asbestos Convol N/A <br />(9D ~Ys) <br /> Group 919-733-0820. <br />O Complex Source Permit required under 1 S A NCAC <br /> 2D.O80D <br />O The Sedimentation Pollution Convol Act of 1973 must be properly addressed for any land disturbing activity. An erosion & <br /> sed'unentatien convol plan will be required if ono or more acres to he disturbed. Plan filed with proper Regional 01~ce (land Quality 20 days <br /> Sect,) At least 30 days before beginning activity. A fee of 330 for the first acre and 52000 for each additional acre or part must (30 days) <br /> accompany the plan. <br />O The Sedimrntation Pollution convol Ad of 1973 must be addressed with respect to the referrneed Local Ordinance. (30 days) <br />O 1v[ining permit On-site inspection usual. Surety bond filed with ENR, Bond amount varies <br />t <br />d <br />30 days <br /> er <br />grea <br />with type mine and number of acres of affected land: Any are mine <br /> than one acre must be permitted. The appropriate bond must be received (60 days) <br /> before Uta permit can be issued. <br />Q North CarolinaBurning permit t)rr-sits inspection by N.C. Division Forest Resources if permit exceeds 4 days 1 daY <br />(N/A) <br />p Special Ground Clearance guming Permit • 22 t]tt-site inspection by N.C. Division Forest Resources requ'ved "if mare than <br />ld b I ~Y <br />(, I/A) <br /> counties in coastal N.C, with organic soils e <br />five acres of ground clearing activities are involved. Inspections shou <br /> requested at least ten days before actual bum is planned" <br />p OiI Refining Facilities N/A 90-120 days <br />(I+1/A) <br />p Dam Safety Permit ~ (f permit required. application 60 days before begin wnsiruction. Applicant <br /> must hire N.C. qualified engineer to: prepare plans, irtspect construction, <br /> ' certify construction is according to ENR approved plans. May also require 30 days <br /> permit under nxuquito convol program. And a 404 permit from Corps of <br /> Engineers. An inspection of site is necessary to verify Hazard Classification. A (60 days)' <br /> minimum fee ofS200.00 must accompany the application. An additional <br /> processing fee based on a percentage or the total project cost will ba required <br />