Browse
Search
2019-532-E DEAPR - Riley Surveying Twin Creeks additional survey work
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-532-E DEAPR - Riley Surveying Twin Creeks additional survey work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2019 4:39:16 PM
Creation date
8/22/2019 2:42:41 PM
Metadata
Fields
Template:
Contract
Date
8/2/2019
Contract Starting Date
8/2/2019
Contract Ending Date
8/30/2019
Contract Document Type
Contract
Amount
$3,600.00
Document Relationships
R 2019-532 DEAPR - Riley Surveying Twin Creeks additional survey work
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:C1E6582F-30E7-4FFE-8A42-B792ACDE7CD4 <br /> Riley Surveying, P.A. <br /> 3326 Durham Chapel Hill Blvd. Suite B-100 <br /> Durham,North Carolina 27707 <br /> AN ESTIMATE <br /> FOR THE PROVISION OF LIMITED <br /> PROFESSIONAL SERVICES <br /> DATE: August 1, 2019 <br /> CLIENT: Orange County <br /> 306A Revere Rd. <br /> Hillsborough, NC 27278 <br /> Attention; Marabeth Carr <br /> PROJECT NAME/LOCATION: County of Orange <br /> Additional Partial Topographic Survey <br /> Carrboro, NC <br /> SCOPE AND EXTENT OF SERVICES: Additional Field measurements,computations and <br /> computer drafting necessary to perform a field survey and prepare mapping of"Areas 1 <br /> and 2"as per exhibit by Civil Consultants,incorporated herein by reference. These two <br /> areas will be tied to the existing Topographic Survey of a portion of Twin Creeks Park, <br /> dated May 7, 2019 by Riley Surveying, PA. Field survey and mapping shall accurately <br /> depict: one foot contour intervals,overhead utilities with sag elevation,treelines and the <br /> existing gravel drive along with any other observable features that may impact on site <br /> design. <br /> Hourly Not to Exeed- $3,600.00 plus reimbursables <br /> SPECIAL CONDITIONS: <br /> 1. We are prepared to commence work within 5-10 days of execution of this <br /> Agreement. Please allow 3-5 days hence for completion of the survey which shall <br /> consist of a sealed survey and unsealed digital files(.dwg and.pdo. <br /> 2. The survey shall conform in all respects with 21 NCAC 56(NC Standards of <br /> Practice). <br /> 3. Cost estimate is based on Areas 1 and 2 being surveyed at the same time. <br /> The Terms and Conditions contained in the attached Terms and Conditions shall govern the execution of this <br /> Agreement. <br /> This Agreement entered into as of the day and year fist written above. <br /> CLIENT SURVEYOR <br /> Jose,To-rres� <br /> Authorized Signature Jose L.Torres, PLS <br /> Vice-President <br />
The URL can be used to link to this page
Your browser does not support the video tag.