Browse
Search
2019-521-E AMS - Otis Elevator Whitted repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-521-E AMS - Otis Elevator Whitted repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2019 4:23:24 PM
Creation date
8/22/2019 2:41:11 PM
Metadata
Fields
Template:
Contract
Date
8/2/2019
Contract Starting Date
8/2/2019
Contract Ending Date
12/31/2019
Contract Document Type
Agreement - Construction
Amount
$129,578.00
Document Relationships
R 2019-521 AMS - Otis Elevator Whitted repair
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05/20/2019_CLC version <br />© OTIS ELEVATOR COMPANY, 2015 All Rights Reserved Page 13 of 16 <br />SECTION IX: ALTERNATES <br /> <br />ALTERNATE #1 - NEW CAB INTERIOR <br /> <br />A new elevator car interior shall be provided. Otis will upgrade the above referenced elevators with the Interiors listed <br />below. All material provided shall be manufactured and installed in accordance with the ASME A17.1 Safety Code for <br />Elevators and Escalators. The upgrade shall include the following: <br /> <br />New cab interior panels – The existing elevators shall have the interior walls prepared to accommodate the <br />Interiors Package. This shall include a laminate panel system that spans the full width of the wall sections. Satin stainless <br />steel reveals shall be installed in the corners and against the return and strike jamb portions of the interior. Seven (7) <br />panels shall be finished in plastic laminate as selected from our standard laminate selections. <br /> <br />Ceiling – We shall furnish and install a new brushed stainless steel ceiling assembly. The new lighting shall be LED <br />down lights. The ceiling shall be stainless steel drop pan construction. <br /> <br />Handrail- We shall furnish and install (1) one new brushed stainless steel handrail along the back wall. <br /> <br />Additional cost to base contract price: $12,893.00 <br /> <br />Please indicate your intention to choose this option by initialing here ______ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 47D12065-7220-4277-A47F-FC1DAC0CA54F
The URL can be used to link to this page
Your browser does not support the video tag.