05/20/2019_CLC version <br />© OTIS ELEVATOR COMPANY, 2015 All Rights Reserved Page 7 of 16 <br />PHASE III: Redrill hole if hole cannot accommodate new equipment (not included in base contract price) <br />1. Redrill/ream each hole to a depth and circumference that will accommodate new PVC <br />* NOTE: Additional charges will apply If unnatural obstructions such as footings, pile caps, slabs, steel, <br />concrete/cement, wood, etc. or other than natural soil conditions are encountered. <br />1. All necessary permits to be obtained by Otis. <br />2. Water must be provided by owner on site and in close proximity to drilling area. <br />* NOTE: Additional costs will be added to the contract via change order for loss in productivity due to work <br />stoppage on site caused by others and/or site specific requirements for Safety, Security and/or Drug Testing (onsite). <br />Drilling costs (Phase III) to be added to Contract via Change Order if necessary. <br />DocuSign Envelope ID: 47D12065-7220-4277-A47F-FC1DAC0CA54F