Browse
Search
2019-521-E AMS - Otis Elevator Whitted repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-521-E AMS - Otis Elevator Whitted repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2019 4:23:24 PM
Creation date
8/22/2019 2:41:11 PM
Metadata
Fields
Template:
Contract
Date
8/2/2019
Contract Starting Date
8/2/2019
Contract Ending Date
12/31/2019
Contract Document Type
Agreement - Construction
Amount
$129,578.00
Document Relationships
R 2019-521 AMS - Otis Elevator Whitted repair
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[Departmental Use Only] <br />TITLE Whitted Elevator <br />FY 2020 <br />NORTH CAROLINA <br />CONSTRUCTION AGREEMENT UNDER $250,000.00 <br />ORANGE COUNTY <br />THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the 2nd day of <br />August, 2019, by and between Otis Elevator Company, (hereinafter called the “Contractor”), and Orange <br />County, a body politic and a political subdivision of the State of North Carolina, (hereinafter called the <br />“County,” “Orange County,” and/or “Owner”). <br />W I T N E S S E T H: <br />That the Contractor and the Owner, for the consideration herein named, agree as follows: furnish <br />labor, parts and materials to provide a microprocessor-based HydroAccel™ control system to perform <br />all the functions of safe elevator motion and elevator door control, plus a new elevator cab interior <br />(panels, ceiling and handrail) for Whitted Human Services Center, Building A, 300 W Tryon Street, as <br />detailed in provided quote ZXW190531160933, dated May 31, 2019. <br />1. CONTRACT DOCUMENTS; PRIORITY <br />The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br />Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br />event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br />interpreted in the following order of priority: <br />a. This Agreement. <br />b. Designer Approved Bulletins and/or Field Orders. <br />c. Request for Proposals and addenda thereto. <br />d. Proposal. <br />2. SCOPE OF WORK <br />The Contractor shall furnish and deliver all of the materials, and perform all of the work <br />required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be executed <br />by the Contractor and Owner and in accordance with the following enumerated documents, which are <br />made a part hereof as if fully contained herein: <br />a. Construction Drawings prepared by (Sheet dated ) <br />b. Written specifications prepared by the project engineer. <br />c. ZXW190531160933 proposal dated May 31, 2019 which fully describes the work to be <br />performed. Such work will hereafter be called the “Work”. <br />d. Related documents listed under Section 1 above. <br />Revised 12/18 1 <br />DocuSign Envelope ID: 47D12065-7220-4277-A47F-FC1DAC0CA54F
The URL can be used to link to this page
Your browser does not support the video tag.