Browse
Search
2019-518-E AMS - Smith Sinnett Architecture Southern Campus contract amendment 1
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-518-E AMS - Smith Sinnett Architecture Southern Campus contract amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2019 4:19:18 PM
Creation date
8/22/2019 2:40:51 PM
Metadata
Fields
Template:
Contract
Date
8/1/2019
Contract Starting Date
11/2/2017
Contract Ending Date
2/1/2021
Contract Document Type
Contract Amendment
Amount
-$250,000.00
Document Relationships
2017-635-E AMS - Smith Sinnett Architecture PA for Southern Campus design and construction administrative services
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2019-518 AMS - Smith Sinnett Architecture Southern Campus contract amendment 1
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Asset Management Services <br /> <br />P.O. Box 8181 * 131 West Margaret Lane, 3rd Floor * Hillsborough, North Carolina 27278 <br />Telephone: 919 245-2625 <br />Fax: 919-644-3001 <br />E-mail: AMService@orangecountync.gov <br /> <br /> <br /> <br />Date: July 24, 2019 <br /> <br />Project: Southern Campus Expansion <br /> <br />This contract amendment is to decrease the contract amount by $250,000.00 <br /> <br /> <br />Background: <br /> <br />In November, 2017 Smith Sinnett Architecture PA was awarded a contract to provide the professional <br />services for the Southern Campus Expansion Project. This included the programming, schematic <br />design, permit and construction drawings and construction administration services for the Site, <br />Seymour Center and the Southern Human Services Center. After the schematic design work was <br />completed for these three areas the intent for the Southern Human Services Center changed. The work <br />for Southern Human Services was then placed on hold until further notice. During the FY2019-24 <br />budget planning the funding for the Southern Human Services Center expansion and BOCC meeting <br />space was moved out into future years. Therefore this amendment is to credit back the funds for not <br />performing the permit and construction design for this project. <br /> <br />Change Order Description: <br />This change order is for a credit back to the Southern Campus Expansion Project to remove the <br />professional services portion of work related to the Southern Human Services Building from the scope <br />of work. <br /> <br />Change Order Line Item Cost: <br />The credit is $250,000 deducted from the base contract. <br /> <br /> <br />Original Contract: $889,640 <br />Deduct for Amendment 1: ($250,000) <br />Revised Contract: $639,540 <br /> <br />DocuSign Envelope ID: 588DE211-750B-4443-AF20-9124EAC4B301
The URL can be used to link to this page
Your browser does not support the video tag.