Browse
Search
2019-503-E AMS - Siemens Controls Desigo CC Software upgrade
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-503-E AMS - Siemens Controls Desigo CC Software upgrade
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2019 4:09:53 PM
Creation date
8/22/2019 2:40:10 PM
Metadata
Fields
Template:
Contract
Date
7/15/2019
Contract Starting Date
7/15/2019
Contract Ending Date
6/30/2020
Contract Document Type
Agreement - Construction
Amount
$124,500.00
Document Relationships
R 2019-503 AMS - Siemens Controls Desigo CC Software upgrade
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Jake Snyder <br />Sales Executive <br />215 Southport Dr, Suite 900 <br />Morrisville, NC 27560 <br />Mobile: (919) 413-1666 <br />Email: jacob.snyder@siemens.com <br /> <br />Page 3 of 7 <br />Initials ______ <br /> The existing Siemens Service Agreement contains (4) hours per quarter for on-site <br />training in addition to the (4) hours provided in this scope <br />9. Includes (14) training seats for off-site Siemens BMS training. These training seats can be used <br />individually for courses provided at our Morrisville, NC branch location, according to our <br />published schedule. And/or, Orange County can schedule a specific training course at your <br />facility with a minimum of (7) student seats per course. Course options are: <br /> ST 9203: Desigo CC Workstation I <br /> ST 9254: Desigo CC Workstation II <br /> ST 9273: Desigo CC Master Operator <br /> <br /> <br /> <br />Energy Optimization <br /> Siemens will provide energy optimization through Existing Building Commissioning for the Whitted <br />facility only (focusing on AHU-1A and 1B). <br />1. Evaluation of energy use trends <br />2. Review of programming strategies <br />3. Inspection of current HVAC scheduling <br />4. Assessment of field devices and components for optimal efficiency <br />5. Identification and implementation of low cost / no cost improvements and Facility Improvement <br />Measures (FIMs) <br />6. Ongoing monitoring using Siemens Navigator for FDD (custom fault rules for Whitted AHUs 1A <br />and 1B). <br /> Includes implementation of FDD and customer training. Triage and/or repair of faults <br />identified are not included under this scope. The existing Siemens Service Agreement or <br />Time and Material labor can be used to correct fault deficiencies. <br /> <br /> <br />Exclusions & Clarifications (applies to all sections) <br />1. Pricing assumes normal hours (Monday – Friday). <br />2. Excludes furnishing and installation of the following unless noted otherwise in this proposal; <br />a. Fire Smoke Dampers (FSD) or Smoke Control Dampers (SCDs) <br />b. Power to FSDs or SCDs. 120V power provided by Electrical Contractor (shown as 120V in <br />electrical drawings) <br />c. Starters or disconnects <br />d. Line voltage power <br />e. Control Dampers <br />3. Repairs or replacement due to existing failures. We will bring these issues to your attention when <br />found. <br />4. Proposal excludes any labor or materials beyond the scope of this project <br />5. Bond is Excluded <br />6. Excludes any civil, structural, or architectural penetrations or finishing. <br />7. Excludes high voltage electrical wiring <br />8. Excludes Fire Panel and Life Safety. <br />9. Excludes any on-going service tasks. <br />10. Excludes IP drops that may be necessary for new control panels. <br />11. Proposal excludes sales tax. Sales tax will be included on the invoice unless Siemens receives a completed <br />NCDOR E589CI (North Carolina Affidavit of Capital Expenditures). We have included an NCDOR E589CI <br />form with this proposal for your convenience. <br /> <br />DocuSign Envelope ID: 15027EFD-227A-4F40-AC0E-22DDC9A9A2B9
The URL can be used to link to this page
Your browser does not support the video tag.