Browse
Search
2019-491-E AMS - Warren Hay Hillsborough Commons replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-491-E AMS - Warren Hay Hillsborough Commons replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2019 11:27:55 AM
Creation date
7/26/2019 10:57:45 AM
Metadata
Fields
Template:
Contract
Date
7/25/2019
Contract Starting Date
7/25/2019
Contract Ending Date
10/15/2019
Contract Document Type
Agreement - Construction
Amount
$64,723.00
Document Relationships
R 2019-491 AMS - Warren Hay Hillsborough Commons replacement
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:8D622E36-C805-43F2-A9F6-4B539D44DA03 <br /> shall not activate this non-appropriation provision for its convenience or to circumvent the <br /> requirements of this Agreement, but only as an emergency fiscal measure during a <br /> substantial fiscal crisis. <br /> c. In the event of a change in the Owner's statutory authority, mandate and/or mandated <br /> functions, by state and/or federal legislative or regulatory action, which adversely affects <br /> Owner's authority to continue its obligations under this Agreement, then this Agreement <br /> shall automatically terminate without penalty to Owner upon written notice to Contractor <br /> of such limitation or change in Owner's legal authority. <br /> 10. NOTICES <br /> Any notice required by this Agreement shall be in writing and delivered by certified or registered <br /> mail, return receipt requested to the following: <br /> Owner: Contractor: <br /> Orange County Warren-Hay Mechanical Contractors, Inc <br /> Attn: AMS PO Box 818 <br /> P.O. Box 8181 Hillsborough,NC <br /> Hillsborough,NC 27278 27278 <br /> 11. MISCELLANEOUS <br /> a. Duties and Obligations imposed by the Contract Documents shall be in addition to any <br /> Duties and Obligations imposed by state, federal or local law, rules, regulations and <br /> ordinances. <br /> b. No act or failure to act by the Owner or Contractor shall constitute a waiver of any right or <br /> duty granted them under the Contract Documents, nor shall any act or failure to act <br /> constitute any approval except as specifically agreed in writing. <br /> c. The Work shall be tested and inspected as required by the Contract Documents and as <br /> required by law. Unless prohibited by law the costs of all such tests and inspections <br /> related to state and federal codes such as ADA, Administrative, Electrical, Plumbing, <br /> Mechanical and Building Codes shall be borne by the Contractor. The costs for material <br /> and structural testing shall be conducted by an independent third party at the expense of the <br /> Owner. Delays related to any of the aforementioned tests and inspections shall not be <br /> grounds for delaying the completion of the work. If any such tests and inspections reveal <br /> deficiencies in the Work such that the Work does not comply with terms or requirements <br /> of the Contract Documents and/or the requirements of any code or law the Contractor is <br /> solely responsible for the cost of bringing such deficiencies into compliance with the terms <br /> of the Contract Documents and/or any code or law. <br /> d. Should the Architect, if an architect is retained for the project involving the Work, or <br /> Owner reject any portion of the Work for failing to comply with the Contract Documents <br /> Contractor shall immediately, at Contractor's expense, correct the Work. Any such <br /> rejection may be made before or after substantial completion. If applicable, any additional <br /> expense borne by the Architect under this section shall be paid at Contractor's expense. <br /> e. The Contractor shall not assign any portion of this Agreement nor subcontract the Work in <br /> its entirety without the prior written consent of the Owner. <br /> Revised 12/18 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.