Browse
Search
2019-491-E AMS - Warren Hay Hillsborough Commons replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-491-E AMS - Warren Hay Hillsborough Commons replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2019 11:27:55 AM
Creation date
7/26/2019 10:57:45 AM
Metadata
Fields
Template:
Contract
Date
7/25/2019
Contract Starting Date
7/25/2019
Contract Ending Date
10/15/2019
Contract Document Type
Agreement - Construction
Amount
$64,723.00
Document Relationships
R 2019-491 AMS - Warren Hay Hillsborough Commons replacement
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:8D622E36-C805-43F2-A9F6-4B539D44DA03 <br /> WARREN - HAY <br /> Mechanical Contractors Inc. <br /> Heating and Air Conditioning <br /> P.O.Box 818•Hillsborough,NC 27278 <br /> 919-732-4362 <br /> NC License number 07211 H-1;H-2;H3 <br /> July 3,2019 <br /> Orange County Public Works <br /> Re: DSS building Mayo Street,Hillsborough NC <br /> PROPOSAL <br /> We hereby submit specifications and estimates for: As noted: <br /> • Provide&install(3)Trane 10 Ton Roof top package units with Economizer,non fused disconnect,through <br /> the base electrical replacing(3)Existing Lennox units noted as: <br /> RTU-2 Model#LGB120HH2G Serial#5601G07943 oranee county Asset tae#00011106 <br /> RTU-10 Model#LGB120HH2G Serial#5601G07947 oranee county Asset tat!#00011102 <br /> RTU-13 Model#LGB120HH2G Serial#5601G07944 oranee County Asset tae#00011113 <br /> • Provide&install adapter curbs that will allow new Trane units to be placed back on existing curb eliminating <br /> any roof work requirements. <br /> • Reconnecting to existing power wiring,control wiring and controls. <br /> • Secure required permits,inspections,crane&rigging and removal/disposal of removed equipment. <br /> • Provide start-up and 1 year general warranty. <br /> We propose hereby to furnish material and labor: $49,387.00 <br /> Add Alternate: <br /> • Provide&install factory installed Reheat option and new thermostats with humidity controls to above units <br /> for dehumidification. ADD$15,336.00 <br /> Payment to be made upon completion. <br /> Acceptance: Date: <br /> Exclusions/Clarifications: <br /> • Lead time on equipment with factory installed options 14-21 business days. <br /> • Reconnecting to existing ductwork,power wiring,gas piping,and controls.(If add alternate is accepted we will <br /> install new t-stat with humidity controls. <br /> • After hour,overtime or premium labor. <br /> • Crane mobilization based on(1)trip for all(3)units above. <br /> • Smoke detectors,modification testing by others. <br /> Respectfully submitted by:Ron LaPann Commercial Division ron.laoann(a)warren-hay.com Quote valid for 15 days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.