Browse
Search
2019-491-E AMS - Warren Hay Hillsborough Commons replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-491-E AMS - Warren Hay Hillsborough Commons replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2019 11:27:55 AM
Creation date
7/26/2019 10:57:45 AM
Metadata
Fields
Template:
Contract
Date
7/25/2019
Contract Starting Date
7/25/2019
Contract Ending Date
10/15/2019
Contract Document Type
Agreement - Construction
Amount
$64,723.00
Document Relationships
R 2019-491 AMS - Warren Hay Hillsborough Commons replacement
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:8D622E36-C805-43F2-A9F6-4B539D44DA03 <br /> [Departmental Use Only] <br /> TITLE HC HVAC Replacement <br /> FY 19-20 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 25th <br /> day of July, 2019, by and between Warren-Hay Mechanical Contractors Inc., (hereinafter called the <br /> "Contractor"), and Orange County, a body politic and a political subdivision of the State of North <br /> Carolina, (hereinafter called the "County," "Orange County," and/or"Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br /> Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br /> event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br /> interpreted in the following order of priority: <br /> a. This Agreement. <br /> b. Designer Approved Bulletins and/or Field Orders. <br /> c. Request for Proposals and addenda thereto. <br /> d. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br /> required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br /> executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by N/A (Sheet dated ) <br /> b. Written specifications prepared by the project engineer. <br /> c. Warren-Hay Mechanical Contractors, Inc. proposal dated July 3, 2019, including add <br /> alternate for humidity control, which fully describes the work to be performed. Such work <br /> will hereafter be called the "Work". <br /> d. Related documents listed under Section I above. <br /> Revised 12/18 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.