Browse
Search
2019-462-E AMS - Racanelli Construction South PFAP freezer installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-462-E AMS - Racanelli Construction South PFAP freezer installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 12:11:11 PM
Creation date
7/17/2019 11:41:52 AM
Metadata
Fields
Template:
Contract
Date
7/9/2019
Contract Starting Date
7/9/2019
Contract Ending Date
10/31/2019
Contract Document Type
Agreement - Construction
Amount
$88,000.00
Document Relationships
2020-045-E AMS - Racanelli PFAP freezer installation change order 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
R 2019-462 AMS - Racanelli Construction South PFAP freezer installation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:C2063C1A-926C-4144-9830-38AC585A1867 r CE6200SB _ SUBMITTAL <br /> Project Name,: QUOTE R239018 Proje d Location: us <br /> R+m+e-Uersio+#: R239018-1 Item#.' 1020 <br /> Submitted For Submitted On: 201810&13 <br /> i Submitted By: Dan Meador SubmFned From: <br /> fdentlty#• rag: <br /> System Description: SPHI system System Tay: <br /> Standard Features <br /> EASE OF INSTALLATION&SERVICE PERFORMANCE <br /> • ALL ELECTRICAL COMPONENTS FACTORY WIRED TO TERMINAL BOARD AND EXTENDED DRAIN PAN HEATFRS FOR MORE UNIFORM DEFROST THROUGHOUT <br /> IDENTIFIED,MAKING IT EASY TO FIELD WIRE THE UNIT THE DRAIN PAN AND ADDITIONAL HEAT IN END COMPARTMENTS <br /> • CABINET DESIGN FEATURES FRONT ACCESS PANELS ON EACH SIDE FOR EASY FIXED DEFROST TE RMINATION FOR ELECTRIC <br /> ACCESS TO ELECTRICAL AND REFRIGERATION COMPONENTS INTERNAL PANELS ARE ISOLATED FOR QU IET OP ERATION <br /> COIL HEATER SLOTS HAVE BEEN ENLARGED FOR EASIER INSTALLATION AND INTERNALLY ENHANCED TUBING AND FIN DESIGN FOR HIGHER EFFICIENCY <br /> REPLACEMENT REDUCED HEATER WATTAGES <br /> LIQUID LINE SOLENOID WIRE HARNESS IS FACTORY-INSTALLED FOR QUICK <br /> INSTALLATION <br /> • MOTORS PLUG INTO WIRING HARNESS FOR EASIER SERVICING <br /> ON 4.6 FAN MODELS,DRAIN PAN HAS A LANYARD FOR EASY AND SAFE ACCESS <br /> • PRE-DRILLED HOLES ON THE BACK OF THE UNIT FOR ROOM THERMOSTAT <br /> RELIABLE&DURABLE VERSATILE <br /> • ATTRACTIVE WHITE CABINET LARGE DIAMETER DRAIN HOLE(314"ID)IS LOCATED ON THE BACK OF THE UNIT <br /> MOLDED FAN GUARD DESIGN MADE OF STRONG PLASTIC MATERIAL MINIMAL HEIGHT OF THE LOW PROFILE SERIES MAKES IT IDEAL FOR LOW <br /> SWEAT CONNECTIONS TO REDUCE POTENTIAL FOR LEAKS CEILING COOLERS <br /> ■ <br /> ff <br /> i <br /> r I r <br /> • COIL COATING-ALUMINUM COIL MECHANICAL OPTION-LLSV AND TXV <br /> • CONTROLS-NONE MOTOR TYPE-EC <br /> COIL SELECTION-SI7_E 200 ALM-MTD COMP(R404) NOZZLE SELECTIONS-NOZZLE INSTALLED <br /> VOLTAGE ASSEMBLY SELECTION-230V EC FAN BLADE SELECTION-STANDARD FAN BLADE <br /> FAN GUARD SELECTION-LARKIN PLASTIC GUARD ELECTRICAL OPTIONS-FRNT ACC JHN T'STAT 230V W1MTD ` <br /> D EF ROST TERMINATION FAN DELAY-STANDARD <br /> Minimum Unit Clearances <br /> vz H PLAN VIEW 1 r H 1 + <br /> �jz vz H <br /> _ + <br /> r PLAN VIEW AIR FLOW + NOTE, 1112 H 3 H 1 1jx} <br /> H=Total Height <br /> x evaporator <br /> evil surface. <br /> Two Evaporators <br /> One Evaporator <br />
The URL can be used to link to this page
Your browser does not support the video tag.