Browse
Search
2019-462-E AMS - Racanelli Construction South PFAP freezer installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-462-E AMS - Racanelli Construction South PFAP freezer installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 12:11:11 PM
Creation date
7/17/2019 11:41:52 AM
Metadata
Fields
Template:
Contract
Date
7/9/2019
Contract Starting Date
7/9/2019
Contract Ending Date
10/31/2019
Contract Document Type
Agreement - Construction
Amount
$88,000.00
Document Relationships
2020-045-E AMS - Racanelli PFAP freezer installation change order 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
R 2019-462 AMS - Racanelli Construction South PFAP freezer installation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:C2063C1A-926C-4144-9830-38AC585A1867 LZT055L608 - SUBMITTAL <br /> TTAL <br /> L Prejecf Name: QUOTE R239oio Project Location: US <br /> Quote-Version A: R239015-1 ltem k: 1010 <br /> Submitted For,- Submitted On: 201&VB113 <br /> Submitted By: Dan Meader Submitled From: <br /> Identify#; Tag: <br /> System Description: Split system System Tag: <br /> Standard Features <br /> QUALITY SERVICEABILITY <br /> ALL UNITS ARE COMPLETELY LEAK TESTED IN A HELIUM ENVIRONMENT,BUMP LARGE ELECTRICAL PANEL FOR EASE OF ACCESS <br /> TESTED AND ALLOWED TO CYCLE OFF ON THE HIGH AND LOW PRESSURE PREFABRICATED WIRING HARNESSES FOR TIGHT CRIMP CONNECTIONS AND <br /> CONTROL. CONSISTENT LABELING <br /> EACH UNIT HAS A COPY OF THE RUN DATA SHIPPED INSIDE THE ELECTRICAL RECEIVER WITH FUSIBLE PLUG,LIQUID SHUTOFF VALVE AND CHARGING PORT <br /> PANEL IS STANDARD <br /> • ELECTRICAL CIRCUITS ARE COMPLETELY CHECKED FOR CONTINUITY SIGHT GLASS IS EASILY VIEWABLE <br /> • ENCAPSULATED,AUTO-RESET,HIGH AND LOW PRESSURE CONTROLS TO UNIT STAYS ON IF THE HOOD IS REMOVED FOR SERVICING <br /> ELIMINATE LEAKS(STANDARD ON ALL HIGH AND MEDIUM TEMPERATURE <br /> MODELS,ADJUSTABLE LOW PRESSURE CONTROL STANDARD ON LOW <br /> TEMPERATURE MODELS) <br /> • PIPING IS LAID OUT TO MINIMIZE STRESS AND VIBRATION AND IS PRE-BENT TO <br /> ELIMINATE LEAKS <br /> COMPONENT CABINET AND CONSTRUCTION <br /> • COMPRESSOR: 112 TO 1 HP COMPRESSORS ARE RIGID MOUNTED AND HAVE A HEAVY DUTY STEEL RAISED BASE WITH 1-112"LEGS <br /> DISCHARGE LOOP PAINTED STEEL CABINETS FOR SUPERIOR STRENGTH AND CORROSION <br /> • COMPRESSOR: DISCHARGE SERVICE VALVES COME STANDARD ON ALL UNITS PROTECTION <br /> PAN: SPECIFICALLY MATCHED WITH MOTOR AND COIL TO ATTAIN MAXIMUM AIR <br /> MOVEMENT AND COOLING <br /> • DEFROST TYPE-ELECTRIC DEFROST COIL SELECTION-ALUMINUM FIN COIL <br /> • LIQUID LINE OPTIONS-LIQUID STANDARD SUCTION LINE OPTIONS-FILTER&ACCUMULATOR <br /> • HI-LO PRESSURE OPTIONS-AOJ-LOW PRESSURE CONTROL BRAND LABEL OPTION-LARKIN <br /> • DISCHARGE LINE OPTIONS-OIL SEPERATOR&HD PRESS VLV CABINET OPTIONS-PAINTED•OUTDOOR <br /> • CRANKCASE HEATER OPTIONS-CRANKCASE HEATER DEFROST TIMER OPTIONS-TIMER AND CONTACTOR <br /> Minimum Unit Clearances <br /> Walls or Obstructions for Multiple Units with Horizontal Air Flow <br /> Horizontal Air Flow AIR FLOW AIR FLOW <br /> AIR W* *W = W* <br /> FLOW MIN. unit width lijMIN. <br /> W* MIN, W*MIN. <br />
The URL can be used to link to this page
Your browser does not support the video tag.