Browse
Search
2019-462-E AMS - Racanelli Construction South PFAP freezer installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-462-E AMS - Racanelli Construction South PFAP freezer installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 12:11:11 PM
Creation date
7/17/2019 11:41:52 AM
Metadata
Fields
Template:
Contract
Date
7/9/2019
Contract Starting Date
7/9/2019
Contract Ending Date
10/31/2019
Contract Document Type
Agreement - Construction
Amount
$88,000.00
Document Relationships
2020-045-E AMS - Racanelli PFAP freezer installation change order 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
R 2019-462 AMS - Racanelli Construction South PFAP freezer installation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:C2063C1A-926C-4144-9830-38AC585A1867 <br /> Box Load Resu1#s <br /> Project Name, QUOTE R239018 Project Location.- <br /> Won'wide ReNgferationQuote ID&Version: R239018-1 item#: 1000 <br /> Submitted For., Submitted On: 0811312018 <br /> Submitted By: Dan Meador Submitted From: HeatcraR RPP <br /> fdenfity#: Tag: <br /> a_ <br /> Room Type General Freezer Wall Load 4,9og 26.0% <br /> Room Location Outdoor lnfrlfration Load 9,117 48.0% <br /> Roam Temperature{deg.F} -10.0 Product Load 946 5.0% <br /> Ambient Temperature(deg.F) 95.0 Miscellaneous Load 2,464 13.0% <br /> Room Shape Rectangle Safety Load"(10%) 1,744 9.0% <br /> Total Roam Volume(cu.tYJ 2,523 Runtime(Hrs) 18.0 <br /> Length{R} 19.25 15.42 1 19.25 15.42 <br /> Height(ft) 8.5 <br /> s <br /> Walt#1 95.0 Foam-in-Place 4.0 0.12 33.33 163.63 <br /> Wall#2 95.0 foam-in-Place 4.0 0.12 33.33 131,04 <br /> well#3 95.0 Foam-in-Place 4.0 0.12 33.33 163.63 <br /> Wall#4 95.0 Foam-in-place 4.o 0.12 33.33 131.04 <br /> Ceding 115.❑ Foam-in-Place 4.0 0.12 33.33 296.77 <br /> Floor 70.0 Foam-in-Place 4.0 0.12 33.33 296.77 <br /> i <br /> Pear#1 1 7.ORx5.0([ 95.0 50.0 3.0 0.31 0.0 9117.0 <br /> ■ <br /> rlfiscellaneaus 1 null 3785.0 0.0 -10.0 24.0 24.0 <br /> Miscellaneous Load• <br /> Lighting 1 1,353 8TUIH <br /> Personnel 1 311 8TUIH <br /> Forklifts 0 0 BTUIH <br /> Evaporator Motors 1 800 8TUIH <br /> Others 0 0 BTUIH <br /> @ Calcukated load is based on puRdown data as provded by user,ft is lha responsk0ly of The user to ensure appropriate product packaging and air Row cbndlllons prevail to allow producf i <br /> puNdvwn lemperafure within this fkne period. <br /> 'The TOTAL LOAD includes a contingency safety factor to cover the posshffily of unforeseen high load condltlons,excessive ambient temperafures,unexpected increases of business,ar product <br /> packaging changes, <br />
The URL can be used to link to this page
Your browser does not support the video tag.