Browse
Search
2019-462-E AMS - Racanelli Construction South PFAP freezer installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-462-E AMS - Racanelli Construction South PFAP freezer installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 12:11:11 PM
Creation date
7/17/2019 11:41:52 AM
Metadata
Fields
Template:
Contract
Date
7/9/2019
Contract Starting Date
7/9/2019
Contract Ending Date
10/31/2019
Contract Document Type
Agreement - Construction
Amount
$88,000.00
Document Relationships
2020-045-E AMS - Racanelli PFAP freezer installation change order 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
R 2019-462 AMS - Racanelli Construction South PFAP freezer installation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:C2063C1A-926C-4144-9830-38AC585A1867 I CE6n00SB ! SUBMITTAL_ <br /> Projed Iva Me: QUOTE R239018 Project Locadon- US <br /> Quote-version A R239018-1 item i020 <br /> Submitted For, Submitted On: 2018/08/i3 <br /> Submitted By: Dan Meador Submitted From: <br /> fdentity# Tag: <br /> System Description: Spiitsystem System Tag: <br /> :Standard - - <br /> EASE OF INSTALLATION&SERVICE PERFORMANCE <br /> ALL ELECTRICAL COMPONENTS FACTORY WIRED TO TERMINAL BOARD AND EXTENDED DRAIN PAN HEATERS FOR MORE UNIFORM DEFROST THROUGHOUT <br /> IDENTIFIED,MAKING IT EASY TO FIELD WIRE THE UNIT THE DRAIN PAN AND ADDITIONAL HEAT IN END COMPARTMENTS <br /> CABINET DESIGN FEATURES FRONT ACCESS PANELS ON EACH SIDE FOR EASY FIXED DEFROST TERMINATION FOR ELECTRIC <br /> ACCESS TO ELECTRICAL AND REFRIGERATION COMPONENTS INTERNAL PANELS ARE ISOLATED FOR QUIET OPERATION <br /> COIL HEATER SLOTS HAVE BEEN ENLARGED FOR EASIER INSTALLATION AND INTERNALLY ENHANCED TUBING AND FIN DESIGN FOR HIGHER EFFICIENCY <br /> REPLACEMENT REDUCED HEATER WATTAGES <br /> LIQUID LINE SOLENOID WIRE HARNESS IS FACTORY-INSTALLED FOR QUICK <br /> INSTALLATION <br /> MOTORS PLUG INTO WIRING HARNESS FOR EASIER SERVICING <br /> • ON 4-6 FAN MODELS,DRAIN PAN HAS A LANYARD FOR EASY AND SAFE ACCESS <br /> PRE-DRILLED HOLES ON THE BACK OF THE UNIT FOR ROOM THERMOSTAT <br /> RELIABLE R DURABLE VERSATILE <br /> • ATTRACTIVE WHITE CABINET LARGE DIAMETER DRAIN HOLE(3t4"ID)IS LOCATED ON THE BACK OF THE UNIT <br /> • MOLDED FAN GUARD DESIGN MADE OF STRONG PLASTIC MATERIAL MINIMAL HEIGHT OF THE LOW PROFILE SERIES MAKES IT IDEAL FOR LOW <br /> SWEAT CONNECTIONS TO REDUCE POTENTIAL FOR LEAKS CEILING COOLERS <br /> Mounted Options <br /> COIL COATING-ALUMINUM COIL MECHANICAL OPTION-LLSV AND TXV <br /> CONTROLS-NONE MOTORTYPE-EC <br /> • COIL SELECTION•SIZE 200 ALM-MTD COMP(R404) NOZZLE SELECTIONS-NOZZLE INSTALLED <br /> • VOLTAGE ASSEMBLY SELECTION-230V EC FAN BLADE SELECTION-STANDARD FAN BLADE <br /> • FAN GUARD SELECTION-LARKIN PLASTIC GUARD ELECTRICAL OPTIONS-FRNT ACC JHN T'STAT 230V WIMTD <br /> • DEFROST TERMINATION FAN DELAY-STANDARD <br /> Minimum Unit Clearances <br /> PLAN VIEW � 4 <br /> _ 1112 H 1 y2H 11/2H <br /> AIR FLOW s NOTE: 1/2 H 3H 1 112 H <br /> PLAN VIEW E � . <br /> H=Total Height <br /> evaporator <br /> coil surface. <br /> Two Evaporators <br /> One Evaporator <br />
The URL can be used to link to this page
Your browser does not support the video tag.