Browse
Search
2019-462-E AMS - Racanelli Construction South PFAP freezer installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-462-E AMS - Racanelli Construction South PFAP freezer installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 12:11:11 PM
Creation date
7/17/2019 11:41:52 AM
Metadata
Fields
Template:
Contract
Date
7/9/2019
Contract Starting Date
7/9/2019
Contract Ending Date
10/31/2019
Contract Document Type
Agreement - Construction
Amount
$88,000.00
Document Relationships
2020-045-E AMS - Racanelli PFAP freezer installation change order 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
R 2019-462 AMS - Racanelli Construction South PFAP freezer installation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:C2063C1A-926C-4144-9830-38AC585A1867 <br /> 3. The new freezers shall be installed by CSR, LLC. <br /> CSR, LLC <br /> PO Box 13377 <br /> RTP, NC 27709 <br /> Brad Crain <br /> (919)361-5129 <br /> bkcrain@gmail.com <br /> 4. Attachment B—ACR Freezer Drawings for reference only <br /> 5. Attachment C— Freezer Cut Sheets & Submittals for reference only <br /> Drawings: <br /> Electrical drawings to be sent out with next addendum. <br /> Questions: Answer to each question is shown in "RED" below. <br /> 1. What is the scope of work for the electric and fire alarm? —This will be noted on the electrical drawings <br /> 2. What are the specs for the freezers,compressors and blowers —Please see the freezer cut sheets/ <br /> drawings included the addendum <br /> 3. What type of lighting is required for the freezers and who is responsible for the fixtures?The freezer <br /> comes pre-lit and wired,and is essentially"plug and play". <br /> 4. Are the door heaters and condensation heaters part of the scope? —This is all included with the freezer <br /> and installed by the freezer installer—The electrical scope is essentially providing power to the unit <br /> 5. Where is the source of power for these units and what is the run?This will be noted on the electrical <br /> drawings <br /> 6. What is the existing fire alarm?This will be noted on the electrical drawings <br /> 7. <br /> 8. Detail 7 on S6 shows a new building opening but it is not shown on the plans where it gets cut into the building.— <br /> This will align with the freezer doors—to be coordinated with the freezer drawings(included with the addendum) <br /> 9. Do you know when this job will start—We anticipate this project starting immediately. Once bids are received and <br /> reviewed we plan to issue a contract.Once the contract has been signed by all parties we plan to start work. <br /> Typically the contract takes(10)business days to sign.We expect to be starting work on or before April 19,2019. <br /> 2 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.