Orange County NC Website
DocuSign Envelope ID:C2063C1A-926C-4144-9830-38AC585A1867 <br /> 3. S-1 also states under Fire Protection that we are responsible for sealed fire protection design.What does this mean <br /> and is there any fireproofing required. —General Contractor to work with the sprinkler contractor for this scope of <br /> work. <br /> 4. Do we need to include builders risk insurance?Yes--All construction projects are required to have builders risk <br /> insurance. <br /> Attachment A (*Revised 3-10-2015) <br /> Bid Proposal Form: Freezer Pad <br /> Contractor agrees to furnish all materials, labor,wood and any other supplies necessary to complete the above <br /> work,for the sum of: <br /> $ S 2, ooCj Freezer Pad, Electrical, Fire Alarm,Site Grading <br /> ki <br /> Alternate G-1 Drawing S.3 <br /> $ 6 4 . 00 Roof Structure <br /> ■ All work must be completed within 45 days of the project start date(approx. May 17, 2019) <br /> • Contractor is willing to participate in the County's"DocuSign" digital contracting process and enter into <br /> a standard contract with the County. <br /> Acknowledgement of Addendums: I et_+a Z(Write each addendum number received in blank) <br /> r <br /> (Signature of Contractor) (date) <br /> 2 Page <br />