Browse
Search
2019-462-E AMS - Racanelli Construction South PFAP freezer installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-462-E AMS - Racanelli Construction South PFAP freezer installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 12:11:11 PM
Creation date
7/17/2019 11:41:52 AM
Metadata
Fields
Template:
Contract
Date
7/9/2019
Contract Starting Date
7/9/2019
Contract Ending Date
10/31/2019
Contract Document Type
Agreement - Construction
Amount
$88,000.00
Document Relationships
2020-045-E AMS - Racanelli PFAP freezer installation change order 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2020's\2020
R 2019-462 AMS - Racanelli Construction South PFAP freezer installation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:C2063C1A-926C-4144-9830-38AC585A1867 <br /> [Departmental Use Only] <br /> TITLE PFAP Freezer <br /> FY 2018-19 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called"Agreement"), made as of the 9th day <br /> of July, 2019, by and between Racanelli Construction South, Inc., (hereinafter called the "Contractor"), <br /> and Orange County, a body politic and a political subdivision of the State of North Carolina, (hereinafter <br /> called the "County," "Orange County," and/or"Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br /> Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br /> event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br /> interpreted in the following order of priority: <br /> a. This Agreement. <br /> b. Designer Approved Bulletins and/or Field Orders. <br /> c. Request for Proposals and addenda thereto. <br /> d. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br /> required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br /> executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by Summit Design and Engineering Services PLLC <br /> (Sheet S.1 dated 11/27/18, S.2 dated 11-27-18, S.3 dated 11-27-18, S.4 dated 11-27-18, S.5 <br /> dated 11-27-18, S.6 dated 11-27-18, E-1 dated 4-3-19, Addendum 1 dated 4-1-19, <br /> Addendum 2 dated 4-4-19 and for reference Attachment C Freezer Cut & Submittals 10-1- <br /> 18 and Attachment B ACR Freezer Drawings Approved Oct 9, 2018. <br /> b. Alternate 1 - Is NOT included as a part of this contract. Sprinkler & Fire Alarm work has <br /> been excluded from this contract. This also excludes silt fencing from this scope of work. <br /> c. Written specifications prepared by the project engineer. <br /> Revised 12/18 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.