Browse
Search
2019-085-E Solid Waste - Kessler Consulting Recycling comp study
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-085-E Solid Waste - Kessler Consulting Recycling comp study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 3:27:30 PM
Creation date
7/11/2019 2:48:15 PM
Metadata
Fields
Template:
Contract
Date
2/13/2019
Contract Starting Date
2/18/2019
Contract Ending Date
7/31/2019
Contract Document Type
Agreement - Services
Amount
$35,069.00
Document Relationships
R 2019-085 Solid Waste - Kessler Consulting Recycling comp study
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:60890E67-6F1D-48BF-9BD4-7E57F52CDE30 <br /> Orange County,North Carolina <br /> RFP#5253 for Recycling Composition Study <br /> Section 3:Current and Past Experience <br /> Emerald Coast Utilities Authority, Pensacola, Florida <br /> Contact: Randy Rudd, Deputy Executive Director of Shared Services, <br /> 9255 Sturdevant St, Pensacola, FL 32514 <br /> ran dall.rudd@ecua.fl.gov, (850)969-3393 <br /> Recyclables Composition Studies EMERALD COAST <br /> Period of Work: October—December 2015&July—August 2017 L,M[.MES AUTHOr+M <br /> Budget:$19,350& $21,080 <br /> KCI conducted two,four-day recyclables composition studies for ECUA, one in 2015 and one in 2017. <br /> The studies sampled single stream recyclables processed at ECUA's MRF. During each study, 39 samples <br /> of recyclables were pulled and hand-sorted. Samples were obtained from all jurisdictions delivering <br /> recyclables to the MRF. The studies provided a breakdown, by percentage, of the individual types of <br /> materials and contaminants found in the recyclables <br /> stream. This information was used to calculate an <br /> updated average market value of the recyclable KCI has assisted with the <br /> material, as well as provide information to ECUA on procurement of equipment and an <br /> how it can improve its recycling program. KCI was operator for ECUA's new single <br /> responsible for all aspects of project planning and stream recycling MRF. KCI was <br /> execution, including field work, data analysis, and instrumental in the selection of a <br /> preparing a technical memorandum. vendor.....and ongoing <br /> negotiations related to that <br /> Materials Recovery Facility Development project.The KCI team is always <br /> KCI has been working closely with ECUA since 2015 as it knowledgeable,highly competent <br /> defines and evaluates a flexible solution to address and very responsive. <br /> Randy Rudd <br /> both its interim and long-term material processing Deputy Director of Shared Services <br /> needs and enhance waste diversion. KCI assisted ECUA Emerald Coast Utilities Authority <br /> with construction of Florida's newest, state-of-the-art Pensacola,FL <br /> MRF for processing single stream recyclables. KCI <br /> provided technical specifications for procurement <br /> documents for both a MRF equipment vendor and <br /> operator. This included conducting an RCS in fall of <br /> 2015 to define the composition of recyclables it <br /> would be receiving at the MRF for inclusion in the <br /> MRF operator procurement. 4" <br /> KCI then evaluated vendor proposals,worked side-by- <br /> side with ECUA during vendor selection and contract f , <br /> negotiation. Construction of the MRF was completed -_ <br /> in September 2016 and began operation in October <br /> 2016. With the assistance of KCI, ECUA was able to <br /> construct its MRF,from procurement to -' , <br /> j <br /> commissioning, in 11 months. KCI provided ongoing <br /> assistance after the MRF began operation, including overseeing the M R F performance testing in <br /> December 2016. KCI then conducted an RCS in July 2017 as part of the ongoing negotiations with the <br /> former MRF operator. KCI has recently been assisting ECUA in transitioning to operating the MRF <br /> themselves. KCI will be conducting another RCS for ECUA in late 2018. <br /> kessler consulting inc. <br /> Proposals 2018\Orange Co Proposal-final 11 innovative waste solutions <br />
The URL can be used to link to this page
Your browser does not support the video tag.