Browse
Search
2019-085-E Solid Waste - Kessler Consulting Recycling comp study
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-085-E Solid Waste - Kessler Consulting Recycling comp study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 3:27:30 PM
Creation date
7/11/2019 2:48:15 PM
Metadata
Fields
Template:
Contract
Date
2/13/2019
Contract Starting Date
2/18/2019
Contract Ending Date
7/31/2019
Contract Document Type
Agreement - Services
Amount
$35,069.00
Document Relationships
R 2019-085 Solid Waste - Kessler Consulting Recycling comp study
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:60890E67-6F1D-48BF-9BD4-7E57F52CDE30 <br /> Orange County,North Carolina <br /> RFP#5253 for Recycling Composition Study <br /> Section 2:Statement of Understanding <br /> Project Approach and Management <br /> KCI's approach to all project work is simple—to provide our clients with customized,value-added service <br /> of the highest quality in an efficient and cost-effective manner. We approach every project with the <br /> following strategy: <br /> Address the client's needs with an unbiased, independent view toward long-term impacts. <br /> Customize our service to meet the needs and objectives of our client. <br /> Identify practical recommendations that offer cost-effective end results. <br /> Because close coordination with the County staff is essential, we will maintain regular, personal <br /> communication throughout the project to support and facilitate your priorities. We will be clear in our <br /> expectations of what information, input, authorization, etc.,we will need from the County, and the <br /> County will know exactly what our responsibilities are and what can be expected from us. KCI is known <br /> for being clear, concise, and candid with our clients. <br /> Our internal project management procedures have a proven track record that enables us to complete <br /> projects on time and within budget. All internal work assignments include clear instructions, hours for <br /> completion, and due date. Weekly project team meetings are held to discuss the status of assignments, <br /> unexpected issues or challenges, and next steps. This enables us to resolve any unforeseen issues <br /> expeditiously and ensures the project stays on track. <br /> Proposed Scope of Work <br /> Based on KCI's extensive experience with RCSs,we propose the following scope of work to meet the <br /> goals and objectives outlined in the RFP. KCI realizes that respondents can have different <br /> interpretations of the scope and level of effort requested by the County;therefore,to ensure that the <br /> County's needs and objectives are met, KCI welcomes the opportunity to modify and refine the <br /> proposed scope and budget as needed. <br /> The more homogeneous the material stream,the lower the variability between samples.Therefore, <br /> recycling composition studies tend to require fewer samples than waste composition studies to obtain <br /> reliable results. Even so,the greater the number of samples sorted for each of the 11 programs,the <br /> greater the level of accuracy of the resulting data.To stay within the County's stated budget, KCI <br /> proposes to conduct a 5-day sorting event during which up to 55 samples will be sorted,for an average <br /> of 5 samples per program. We have also proposed an alternative 6-day sorting event during which up to <br /> 66 samples would be sorted, for an average of 6 samples per program. Ideally more samples would be <br /> sorted to achieve greater accuracy for each program; however,the proposed study will provide useful <br /> data (including 90%confidence intervals) for each program and reliable data for the overall recycling <br /> stream. <br /> In developing this scope and associated pricing estimate, KCI has assumed the County will assist with or <br /> arrange for the items listed below,which can be adjusted as needed. <br /> • Provide a safe, secure location (approximately 20'x 40')for sorting activities at the County's <br /> landfill. <br /> • Provide a location near the sorting location for tipping loads of recyclables with enough room to <br /> mix and pull a sample from the load. A paved location is strongly recommended. <br /> kessler consulting inc. <br /> Proposals 2018\Orange Co Proposal-final 4 innovative waste solutions <br />
The URL can be used to link to this page
Your browser does not support the video tag.