Browse
Search
2019-085-E Solid Waste - Kessler Consulting Recycling comp study
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-085-E Solid Waste - Kessler Consulting Recycling comp study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 3:27:30 PM
Creation date
7/11/2019 2:48:15 PM
Metadata
Fields
Template:
Contract
Date
2/13/2019
Contract Starting Date
2/18/2019
Contract Ending Date
7/31/2019
Contract Document Type
Agreement - Services
Amount
$35,069.00
Document Relationships
R 2019-085 Solid Waste - Kessler Consulting Recycling comp study
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:60890E67-6F1D-48BF-9BD4-7E57F52CDE30 <br /> �1 <br /> ORANGE COUNTY Department of Solid Waste Management <br /> 5.1.1 states parenthetically to"see section IV,subsection C." To what does this refer?Delete statementsee <br /> section IV,subsection C <br /> 9. 5.3 Please explain howthe 15pointsfor Financial Stabilitywill be determined.There are no setformulas,only a <br /> review by staff <br /> 10. Attachment F:Would the County accept a "Cost peradditional sort day"in lieu of a "Cost per additional <br /> sample"? As a practical matter,the additional cost persample depends on whether it is necessaryto incuran <br /> additional day of expenses and mobilize sort laborforan additional day(which might be a very high cost for an <br /> additional sample),orwhetherwe can tack on a sample at the end of a scheduled sort day(which would be a <br /> lower cost per additional sample). The fixed costs forthis type of work are better captured with a day rate than <br /> a per-sample rate. Please show both additional sample on an existing day e.g.maytake you pasta standard 8 <br /> hour day and thus require OT forte mps. Plus your staff compensation rate may vary.Also show cost of an <br /> additional day. <br /> 1) <br /> Orange County,200 S.Cameron Street,Hillsborough, North Carolina 27278 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.