Browse
Search
2010-171 AMS - Owens Roofing DA and Annex
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2010
>
2010-171 AMS - Owens Roofing DA and Annex
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2019 3:34:51 PM
Creation date
7/3/2019 11:41:50 AM
Metadata
Fields
Template:
Contract
Date
12/3/2010
Contract Starting Date
12/3/2010
Contract Ending Date
1/2/2011
Contract Document Type
Agreement - Construction
Amount
$90,591.00
Document Relationships
R 2010-171 AMS - Owens Roofing DA and Annex
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5thWall Building Diagnostics Consultants Government Services Annex <br /> District Attorney Office <br /> Roof Replacement <br /> November 2009 <br /> DIVISION 6 <br /> WOOD, PLASTICS AND COMPOSITES <br /> SECTION 061000 <br /> ROUGH CARPENTRY <br /> PART GENERAL <br /> 1 . 01 Related Documents <br /> Drawings and general provisions of the contract including General, Supplemental and Special <br /> Conditions, and other Division 1 specification sections apply to work of this section . <br /> 1 . 02 Work Included <br /> A . Installation of new treated wood nailers where required . <br /> Be Replacement of damaged or deteriorated wood nailers and blocking. <br /> 1 . 03 Related Work <br /> A . Selective Demolition — Section 024119 <br /> Be Asphalt Fiberglass Shingles — Section 073113 <br /> C . Sheet Metal Flashing and Trim — Section 076200 <br /> 1 . 04 Environmental Conditions <br /> Material installation shall proceed only when weather conditions are in compliance with the <br /> manufacturer's recommendations for installation and no precipitation is imminent. Materials <br /> installed during adverse weather conditions shall be subject to rejection including removal and <br /> replacement . <br /> 1 . 05 Quality Assurance <br /> A . Contractor shall provide sufficient qualified workmen and supervisors who shall be present <br /> at all times during execution of this portion of the work and who shall be familiar with the <br /> type of construction involved and the materials and techniques specified . <br /> Be The Owner shall make no allowance for lack of skill of the workmen. <br /> 1 . 06 Submittals <br /> A . Product Data : For each type of process and factory-fabricated product . Indicate <br /> component materials and dimensions and include construction and application details . <br /> Be Include data for wood-preservative treatment from chemical treatment manufacturer and <br /> certification by treating plant that treated materials comply with requirements . Indicate <br /> type of preservative used and net amount of preservative retained . <br /> C . For products receiving a waterborne treatment, include statement that moisture content <br /> of treated materials was reduced to levels specified before shipment to Project site . <br /> 09 -26 Rough Carpentry <br /> 0610004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.