Orange County NC Website
5thWall Building Diagnostics Consultants Government Services Annex <br /> District Attorney Office <br /> Roof Replacement <br /> November 2009 <br /> DIVISION 7 <br /> THERMAL AND MOISTURE PROTECTION <br /> SECTION 073113 <br /> ASPHALT FIBERGLASS SHINGLES <br /> PARTI GENERAL <br /> 1 . 01 Drawings and general provisions of the contract including General , Supplemental, and Special <br /> Conditions and other Division 1 Specification sections apply to work of this section . <br /> 1 . 02 Work Included <br /> A. Installation of glass fiber base granular surfaced, dimensional, asphalt shingles . <br /> Be Installation of eave and ice dam protection, ridge protection, flashings, and underlayment . <br /> C . Installation of continuous ridge vent. <br /> D . Installation of static ventilators . <br /> 1 . 03 Quality Assurance <br /> A . Standards : Comply with standards specified in this section and as listed in the general <br /> requirements . <br /> Be Qualifications of Manufacturer : Products used in the work included in this section shall be <br /> produced by manufacturers regularly engaged in the manufacturer of similar items and with <br /> a history of successful production acceptable to the Owner . <br /> Co Qualifications of Contractor : The Contractor and its personnel shall be currently approved <br /> by the manufacturer of the approved products as qualified to install the materials of this <br /> section . <br /> D . Qualifications of Installers : Use adequate numbers of skilled workmen who are <br /> thoroughly trained and experienced in the necessary crafts and who are completely <br /> familiar with the specified requirements and the methods needed for proper performance <br /> of the work in this section . If non-English speaking workmen are employed, the foreman <br /> shall be fluent in their language and in English . <br /> : Make all required notifications and secure all required inspections by the <br /> E . Roof Inspections <br /> manufacturer of the approved materials to facilitate issuance of the specified roof warranty. <br /> 1 . 04 Submittals <br /> A . Contractor shall submit. <br /> 1 . Complete material list of all items proposed to be furnished and installed under this <br /> section . <br /> 2 . Provide shingle configurations , accessory shapes and installation details . <br /> 09 -26 Asphalt Fiberglass Shingles <br /> 073113 - 1 <br />