Orange County NC Website
5thWall Building Diagnostics Consultants Government Services Annex <br /> District Attorney Office <br /> Roof Replacement <br /> November 2009 <br /> F . In addition, should the roof system experience recurring leaks (more than two in a given <br /> section of the roof system) over a period of 12 consecutive months , the building Owner <br /> may request an inspection of that portion of the roofing system experiencing recurring <br /> leaks by the manufacturer or the Owner ' s designated representative . The contractor shall <br /> then follow the recommendations of the inspector as to appropriate resolution of the <br /> problem . <br /> G . Final payment will be made to the Contractor only after three signed and notarized copies <br /> of the warranties and guarantees have been submitted and the shingle manufacturer <br /> acknowledges that all bills are paid . All such documents shall show the project name , <br /> project number, and location and the Owner ' s name . <br /> H . The effective date of all warranties shall be the same and shall be on the date of the last <br /> final inspection when the Owner, Designer , Contractor and Manufacturer agree that all <br /> work has been completed in substantial compliance with the plans and specifications . <br /> PART 2 PRODUCTS <br /> Not Used <br /> PART 3 EXECUTION <br /> Not Used <br /> END OF SECTION <br /> 09 -26 Warranties <br /> 017850 . 3 <br />