Browse
Search
2010-171 AMS - Owens Roofing DA and Annex
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2010
>
2010-171 AMS - Owens Roofing DA and Annex
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2019 3:34:51 PM
Creation date
7/3/2019 11:41:50 AM
Metadata
Fields
Template:
Contract
Date
12/3/2010
Contract Starting Date
12/3/2010
Contract Ending Date
1/2/2011
Contract Document Type
Agreement - Construction
Amount
$90,591.00
Document Relationships
R 2010-171 AMS - Owens Roofing DA and Annex
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5thWall Building Diagnostics Consultants Government Services Annex <br /> District Attorney Office <br /> Roof Replacement <br /> November 2009 <br /> DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> SECTION 017850 <br /> WARRANTIES <br /> PART1 GENERAL <br /> 1 . 01 Related Documents <br /> Drawings and general provisions of the contract including General, Supplemental , and Special <br /> Conditions and other Division 1 specification sections apply to work of this section . <br /> 1 . 02 Related Sections <br /> A . Section 073113 — Asphalt Fiberglass Shingles <br /> Be Section 076200 — Sheet Metal Flashing and Trim <br /> C . Section 079200 — Sealants & Caulking <br /> 1 . 03 Description of Work <br /> Provide Warranties to Owner with Close - Out documents for the sections noted in paragraph 1 . 02 . <br /> 1 . 04 Upon completion of the work and prior to final payment, the Contractor shall submit the <br /> following items to the Designer : <br /> A . Copies of all punchlists to include materials ' manufacturer ' s and Designer ' s punchlists , <br /> and documentation of completion . <br /> Be Manufacturer ' s report that the project has been inspected and is suitable for warranty . <br /> C . Manufacturer ' s special warranty to Owner . <br /> D . Contractor ' s warranty to Owner . <br /> 1 . 05 Submit all items required by this section as a part of Section 017839 , Project Record Documents . <br /> 1906 Install placards denoting roof and warranty information . Placards shall be provided by the Owner. <br /> Placards to be permanently mounted at all locations of egress to the roof. <br /> 1 . 07 Warranties <br /> A . Comply with the General Conditions and Supplemental Conditions of the Contract <br /> concerning warranties and bonds . The Contractor shall agree that the work covered <br /> under this contract shall remain free from any water penetration and physical defects <br /> caused by defective workmanship including installation for a period as noted below from <br /> the date of final acceptance by the Owner . <br /> 09 -26 Warranties <br /> 017850 . 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.