Orange County NC Website
5thWall Building Diagnostics Consultants Government Services Annex <br /> District Attorney Office <br /> Roof Replacement <br /> November 2009 <br /> C . Unless otherwise directed by the Owner, the Contractor shall clean all adjacent areas on the <br /> site and completely remove all resultant debris . <br /> 3 . 04 Contractor shall visually inspect all exterior surfaces and remove all traces of dirt, waste materials , <br /> smudges , splashed materials and other foreign matter . The Designer may require that light <br /> sandblasting or other cleaning be performed at no additional cost to the Owner. If such cleaning is <br /> required, the Contractor shall take all necessary precautions to prevent damage to adjacent materials, <br /> property and vegetation . <br /> END OF SECTION <br /> 09 -26 Cleaning <br /> 01771002 <br />